FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU B.Tech 2020 Winter 7th Sem 2171501 Operations Planning And Control Question Paper

Download GTU (Gujarat Technological University Ahmedabad) B.Tech/BE (Bachelor of Technology/ Bachelor of Engineering) 2020 Winter 7th Sem 2171501 Operations Planning And Control Previous Question Paper

This post was last modified on 04 March 2021

GTU B.Tech 2020 Winter Question Papers || Gujarat Technological University


FirstRanker.com

Subject Code:2171501

GUJARAT TECHNOLOGICAL UNIVERSITY

--- Content provided by⁠ FirstRanker.com ---

BE- SEMESTER-VII (NEW) EXAMINATION - WINTER 2020

Subject Name:Operations Planning & Control

Time:10:30 AM TO 12:30 PM

Instructions:

1. Attempt any FOUR questions out of EIGHT questions.

--- Content provided by FirstRanker.com ---

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.

Q1 (a) Define Operations Planning & Control. MARKS 03

(b) Discuss the role of PPC executive in materials control function in Job order production industry. 04

Q2 (a) Explain the role of OPC in improving overall manufacturing performance of the organization. 07

--- Content provided by⁠ FirstRanker.com ---

(b) What is dispatching? 03

(c) Explain in brief : Computer Integrated Manufacturing (CIM). 04

Q3 (a) Explain crucial functions of PPC and the concerned departments. 07

(b) What is sales forecasting? 03

(c) Explain ‘Regression analysis’ method of sales forecasting. 04

--- Content provided by‍ FirstRanker.com ---

Q4 (a) The sales pattern of an automobile gear mfg. company is as follows: 07

Year 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019

Sales 34.7 | 35.2 | 35.8 | 36.8 | 36.2 | 37.3 | 38.5 | 40.1 (Rs.Crores)

Compute the 3 yearly moving trend and find out the sales forecast for the year 2020.

Q5 (a) What is process planning? 03

--- Content provided by‍ FirstRanker.com ---

(b) Explain process planning procedure. 04

(c) An engineering company uses a special type of pin at an approximately constant rate of 7000 units, per year. The pins are manufactured at the company’s own plant. Each pin costs the company Rs. 90. The setup cost per production run is Rs. 2500. The inventory carrying charges are estimated at 22% of the average inventory investment.

What quantity of pins should be manufactured in each production run for minimum cost? Also find out the frequency of production runs to be made. 07

Q6 (a) What is scheduling? 03

(b) Differentiate between Gantt chart and Machine load chart. 04

--- Content provided by‌ FirstRanker.com ---

(c) Explain scope of scheduling with example. 07

Q.7 (a) What is job sequencing? 03

(b) State assumptions underlying Johnson’s algorithm for sequencing. 04

(c) Use Johnson’s rule to find out the best sequence and find total idle time for following data: 07

Date:19/01/2021 Total Marks: 56

--- Content provided by FirstRanker.com ---

Lathe 4 7 5 10 12 8

Shaping 5 8 4 9 7 6

Q.7 (a) What is assembly line balancing? 03

(b) Discuss capacity planning with an example. 04

(c) Following is the period demand forecast for a company: 07

--- Content provided by FirstRanker.com ---

Period | 1 | 2 | 3 | 4 | 5 | 6

Demand | 320 | 410 | 470 | 350 | 290 | 310

Consider following plans and choose between the two.

(1) Produce for average demand through out the periods, change the work force level to meet the balance.

(i1) Produce 200 units every period and meet the balance by subcontracting.

--- Content provided by FirstRanker.com ---

Cost data as per : Hiring cost Rs. 100/person, Firing cost Rs. 75/person, Subcontracting cost Rs. 75/unit

Q.8 (a) Discuss Aggregate planning. 03

(b) Discuss MPC system schema. 04

(c) Using Heuristic approach, solve the following problem for a cycle time 8 min. and find: - 07

(1) Mini. no. of work stations &

--- Content provided by‍ FirstRanker.com ---

(i1) Line efficiency

Operation | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11

Immediate Predecessor | - | 1 | 1 | 2 | 3 | 4 | 4 | 5 | 6 | 6 | 8,9 | 7,10

Time (Min.) | 3 | 3 | 6 | 2 | 4 | 2 | 5 | 7 | 3 | 5 | 4


--- Content provided by‌ FirstRanker.com ---


This download link is referred from the post: GTU B.Tech 2020 Winter Question Papers || Gujarat Technological University