Download GTU B.Tech 2020 Winter 8th Sem 180603 Professional Practice And Valuation Question Paper

Download GTU (Gujarat Technological University Ahmedabad) B.Tech/BE (Bachelor of Technology/ Bachelor of Engineering) 2020 Winter 8th Sem 180603 Professional Practice And Valuation Previous Question Paper

Seat No.: ________
Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
BE- SEMESTER?VIII (OLD) EXAMINATION ? WINTER 2020
Subject Code:180603 Date:21/01/2021
Subject Name:Professional Practice & Valuation
Time:02:00 PM TO 04:00 PM Total Marks: 47
Instructions:
1. Attempt any THREE questions from Q.1 to Q.6.
2. Q.7 is compulsory.


3. Make suitable assumptions wherever necessary.

4. Figures to the right indicate full marks.
Q.1 (a) The Plan of a residential building is shown in Figure-1. Calculate quantity of following items 14
in a quantity sheet. Adopt suitable brief specifications. Use long wall/ short wall method.
1. Excavation in foundation
2. B.B.C.C. (1:4:8) in foundation.
3. First class brick work in foundation and plinth in cement mortar 1:6
4. 2.5 cm thick Damp proof course.
1


Q.2 (a) Explain various types of detail estimates.
07

(b) Write Detailed specifications for excavation in foundation.
07



Q.3 (a) What is meant by analysis of rates ? How the rate per unit of an item is fixed.
07

(b) Write detail specification of Timber door and windows and Cement concrete (1:4:8) for 07
foundation.




Q.4 (a) What is the importance SOR? Mention rates of at least 10 important building materials 07
prevailing in your city.

(b) Calculate the following: 1) No. of bricks required for 1cu.m. brick work.
07
2) No. of cement bags for 1 cu.m. brick work in cement mortar 1:4



Q.5 (a) Write short note on "Condition of Contract" and Explain important contractual conditions. 07

(b) Define Tender and Give detail classifications of Tenders.
07



Q.6 (a) Discuss the factors affecting selection of construction equipment.
07

(b) What are the reasons of exceeding the actual cost to estimated cost?
07



Q.7 (a) A building is constructed in a plot of 175 sq.mt. Costing Rs. 50,000. The cost of construction 05
is Rs.1,00,000. The life of building is 75 years . The owner desires 7% return on land value
and 9% return on construction cost. Annual repair are 1% of the construction cost. Taking 5%
rate of interest for sinking fund. Calculate annual rent of building. The scrap value is zero.
Take outgoings as 3% of gross income.


OR




Q.7 (a) Write a short note on following (Any two)
05
1. Valuation table.
2. Schedule of rates (SOR)
3. Difference between Depreciation and Obsolescence.
4. Difference between freehold property and lease hold property
5. Detail estimate.
******************************