FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU B.Tech 2020 Winter 8th Sem 2181916 Energy Conservation And Management Question Paper

Download GTU (Gujarat Technological University Ahmedabad) B.Tech/BE (Bachelor of Technology/ Bachelor of Engineering) 2020 Winter 8th Sem 2181916 Energy Conservation And Management Previous Question Paper

This post was last modified on 04 March 2021

GTU B.Tech 2020 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE- SEMESTER-VIII (NEW) EXAMINATION — WINTER 2020

--- Content provided by‍ FirstRanker.com ---

Subject Code:2181916 Date:19/01/2021
Subject Name:Energy Conservation And Management
Time:02:00 PM TO 04:00 PM Total Marks: 56

Instructions:
1. Attempt any FOUR questions out of EIGHT questions.

--- Content provided by‌ FirstRanker.com ---

2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

MARKS

Q.1 (a) Explain the following terms: Sectorial energy consumption, energy intensity, energy pricing. 03
(b) Briefly explain various schemes relating to Bureau of Energy Efficiency (BEE) for designated consumers, State designated agencies. 04

--- Content provided by⁠ FirstRanker.com ---

(c) A plant has 4 electroplating process tanks of total capacity of 2000 liters, where hot water at 75 °C is used for process, make up water requirement for four tanks is around 1000 liters per day. During the week end tanks will be cleaned and it will be topped up with fresh water 25 °C of 2000 liters, The plant has planned to switch over from electrical heating to solar water heating for make up water requirement. Cost of electricity for the plant is Rs 5.15 per kWhr. Solar water heating system supplier guaranteed make up water can be heated up to 75 °C. If the cost of solar water heater is Rs 250,000 for 1000 liters capacity evaluate the simple payback period taking 300 days process operations. 07

Q.2 (a) Write brief note on critical thickness of Insulation. 03
(b) Distinguish between energy conservation and energy Management. 04
(c) Briefly explain how energy audit is carried in a thermal power plant. How is the audit report prepared? 07

Q.3 (a) Explain energy conservation Act 2001 and its features, notifications under the Act. 03

--- Content provided by​ FirstRanker.com ---

(b) Write brief note on ECBC code for Building Construction. 04
(c) Classify waste heat recovery devices and potential of generating energy from it. 07

Q.4 (a) Explain techniques of bench marking for maximizing system efficiency with examples. 03
(b) Discuss the role of Energy Service Companies for financial management. 04
(c) List application, advantages of Thermic fluid heaters and super critical boilers from energy conservation point of view. 07

--- Content provided by‌ FirstRanker.com ---

Q.5 (a) List various instruments used for carrying out energy audit. 03
(b) Briefly explain Ice bank system from energy conservation point of view. 04
(c) Explain techniques of energy conservation in refrigerated cold storage plants. 07

FirstRanker.com

FirstRanker.com

--- Content provided by⁠ FirstRanker.com ---

Q.6 (a) Explain Indian strategy of energy saving for future. 03
(b) Define the terms: Return on Investment, Net present value, Internal rate of return, Time value of money 04
(c) Compare direct and indirect method of calculating boiler efficiency, list step wise procedure for calculating boiler efficiency. 07

Q.7 (a) Explain method of selection and application of refractories. 03
(b) Explain the terms: Sustainable development, Kyoto Protocol. 04

--- Content provided by‌ FirstRanker.com ---

(c) List various opportunities for energy savings in steam piping systems. 07

Q.8 (a) How is bachhat lamp yojna implemented and its effect on related industries? 03
(b) Explain briefly: clean development mechanism, prototype carbon fund. 04
(c) Explain heat balance of forging furnace and its performance evaluation from energy conservation point of view. 07

FirstRanker.com

--- Content provided by‌ FirstRanker.com ---



This download link is referred from the post: GTU B.Tech 2020 Winter Question Papers || Gujarat Technological University

--- Content provided by‌ FirstRanker.com ---