Roll No. Total No. of Pages : 03
Total No. of Questions : 09
B.Tech.(CE) (2011 Onwards) (Sem.-5)
--- Content provided by FirstRanker.com ---
GEOTECHNICAL ENGINEERINGSubject Code : BTCE-502
M.Code : 70513
Time : 3 Hrs. Max. Marks : 60
INSTRUCTION TO CANDIDATES :
--- Content provided by FirstRanker.com ---
- SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
- SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
- SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
SECTION-A
- Answer briefly :
- Given : e(void ratio) = 0.86, w =28%, G =2.72
--- Content provided by FirstRanker.com ---
Calculate youw, and ysat. - If ate =0.4, k (co-efficient of permeability) = 0.001 cm/sec
Then, ate=0.6, k=? - Given: H=2m, Cv=0.0002 sq. cm/ sec (double drainage)
How long it will take to attain half of the total settlement? - If G=2.68 w=17%
Calculate theoretical maximum dry density. - A soil sample consists of Gravel 30%, sand 40%, silt + clay 30%
LL =33%, PI = 12%
Write down soil classification as per 1498-1970. - Define critical hydraulic gradient.
- Give the statement of Darcy’s law.
- Write down particle size ranges of sand, silt and clays.
- Define ‘Co-efficient of volume change’.
- Define over-consolidation ratio.
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
- Given : e(void ratio) = 0.86, w =28%, G =2.72
SECTION-B
- A new canal is excavated to a depth of 5 m below ground level in a soil having the following characteristics : ¢ = 14 kN /m3; ¢ =15° e =0.8 and G =2.7. The slope of bank is 1 in 1. Calculate the FOS with respect to cohesion when the canal runs full. If it suddenly and completely emptied, what will be FOS then? (Stability No Sn for ¢ = 7.3 and 15 degree may be taken as 0.112 and 0.083)
- The following data are given for a soil sample. Porosity = 0.45,
Sp. Gr of soil solids = 2.68, Moisture content = 10%--- Content provided by FirstRanker.com ---
Determine the mass of water to be added to 10 m3 of soil for full saturation. - The time required for 50% consolidation of 25 mm thick clay layer (double drainage) in the laboratory is 2 min 20 sec. How long (in days) will it take for a 3 m thick clay layer of the same clay in the field under the same pressure increment to reach 50% consolidation?
In the field, there is a rock layer at the bottom of the clay. - How do you determine Co-efficient of permeability in laboratory on a clay sample?
Explain and derive the expression for it. - Write short notes on the following :
- Isochrones.
- Field Compaction control method.
--- Content provided by FirstRanker.com ---
SECTION-C
-
- Enumerate the assumptions in Terzaghi’s theory of one-dimensional consolidation (2)
- Derive the Terzaghi differential equation for one-dimensional primary consolidation.
--- Content provided by FirstRanker.com ---
-
- Enumerate the advantages of tri-axial shear strength tests. (2)
- Draw a typical stress-strain and volume change curve for loose and dense sand. (4)
- Following are the results of two drained tri-axial tests on the same clay samples.
--- Content provided by FirstRanker.com ---
Sample I: s3 = 70kN/m2, sd= 173kN/m2
Sample II: s3 = 105 kN/ m2, sd = 235 kN/m2
Determine shear strength parameters.
(s3 = Cell Pressure, sd = Deviatoric stress) (4)
- Differentiate between followings :
- Standard and modified Proctor tests for compaction.
- Compaction and Consolidation.
- Finite slope and Infinite slope.
- Discharge velocity and Seepage Velocity.
- Consolidated drained and Consolidated undrained test. (5x2)
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.
FirstRanker.com--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU B.Tech Dec 2018 5th Semester Question Papers || Punjab Technical University