Roll No.
Total No. of Questions : 09
--- Content provided by FirstRanker.com ---
Total No. of Pages : 02
B.Tech.(ME) (E-I 2011 Onwards) (Sem.-6)
INDUSTRIAL ENGG.
Subject Code : DE/ME-2.1
M.Code: 71253
--- Content provided by FirstRanker.com ---
Time: 3 Hrs.
Max. Marks : 60
INSTRUCTION TO CANDIDATES :
- SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
- SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
- SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
--- Content provided by FirstRanker.com ---
SECTION-A
- Answer briefly :
- Define Industrial Engineering.
- Enumerate principles of good layout.
- What is line of balance?
- Differentiate between Production and Productivity.
- Define Work study.
- Explain in brief various techniques for micro motion study.
- What is contingency allowance?
- How displays can be economically designed on machines?
- Enumerate the benefits of job rotation.
- What is value engineering?
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
SECTION-B
- Explain the qualities an Industrial Engineer should possess.
- Based on the information given in the Muther's grid, develop the plant layout in the arrangement shown. Department 1 must be in the location shown below :
Deptt-1 EAEEXAU
Deptt-2 A A?
Deptt-3 UAXXX--- Content provided by FirstRanker.com ---
Deptt-4 UIAA
Deptt-5 XOU
Deptt-6 E A
Deptt-7 A
1--- Content provided by FirstRanker.com ---
Deptt-8 - What is method study? Explain in brief various charts and diagrams utilized in method study.
- What is job enrichment? Discuss the methods for achieving job enrichment at workplace.
- Explain the role of ergonomics in product design.
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
SECTION-C
-
- In order to achieve sound plant layout, explain in detail the scientific step by step procedure that must be followed.
- State the relationship between cumulative timing and fly back timing. How standard time is calculated?
-
- Discuss the following :
- Work Study and Management.
- Work Study and the Worker.
--- Content provided by FirstRanker.com ---
- Describe the steps involved in value engineering studies. Also enumerate the applications of value engineering.
- Discuss the following :
-
- Describe the ergonomic considerations in designing man machine systems.
- How various material handling equipment can be classified?
--- Content provided by FirstRanker.com ---
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.
--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU B.Tech 6th Semester Last 10 Years 2009-2019 Previous Question Papers|| Punjab Technical University