Code: 15A03804
Time: 3 hours
--- Content provided by FirstRanker.com ---
B.Tech IV Year II Semester (R15) Regular Examinations April 2019
INDUSTRIAL ENGINEERING
(Mechanical Engineering)
Max. Marks: 70
PART - A
--- Content provided by FirstRanker.com ---
(Compulsory Question)
Answer the following: (10 X 02 = 20 Marks)
- (a) Define organization and list out different types of organizations.
- (b) State Douglas McGregor's theory X and Y.
- (c) What are the factors to be considered while selecting a plant location?
- (d) List out any four material handling equipments used in continuous production.
- (e) Define the terms: (i) Sampling. (ii) Performance rating.
- (f) Give the various symbols used in recording techniques with their meaning.
- (g) Give the examples for: (i) Direct inventories. (ii) Indirect inventories.
- (h) Define the terms: (i) Set-up cost. (ii) Holding cost.
- (i) What you mean by process control?
- (j) Define the terms: (i) Quality of design. (ii) Quality of performance.
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
PART - B
(Answer all five units, 5 X 10 = 50 Marks)
UNIT - I
--- Content provided by FirstRanker.com ---
Describe the various steps involved in organizing procedure.
OR
Define management. Explain the functions of management with help of examples.
UNIT - II
Define plant layout. Explain different types of plant layouts.
--- Content provided by FirstRanker.com ---
OR
Explain the principles of material handling.
UNIT - III
State and explain the steps involved in method study procedure.
OR
--- Content provided by FirstRanker.com ---
How can you calculate the standard time using time study procedure?
UNIT - IV
Find the optimal order quantity for a product for which the price breaks are follows:
Quantity (Units) | Price per unit (Rs) |
---|---|
0 to 100 | 200 |
101 to 200 | 180 |
Above 200 | 160 |
The monthly demand of the product is 400 units. The storage cost is 20 percent per year of the price of the product per unit. Ordering cost is Rs.50 per order.
OR
--- Content provided by FirstRanker.com ---
A company has to purchase four items A, B, C and D for the next year. The projected demand and unit price (in Rs) are as follows:
Item | Demand (Units) | Unit price (Rs) |
---|---|---|
A | 60000 | 3 |
B | 40000 | 2 |
C | 1200 | 24 |
D | 5000 | 4 |
If the company wants to restrict the total number of orders to 40 for all the items. How many orders should be placed for each item?
UNIT - V
State the objectives of control charts and describe the different control charts for variable and attributes.
OR
--- Content provided by FirstRanker.com ---
Discuss the implementation of lean manufacturing.