FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download RGUHS MHA 2020 November 4th Sem 8727 Hospital Administration Strategic Management And Project Management Rs 4 Question Paper

Download RGUHS MHA (Master of Health Administration) 2020 November 4th Sem 8727 Hospital Administration Strategic Management And Project Management Rs 4 Previous Question Paper

This post was last modified on 12 June 2021

This download link is referred from the post: RGUHS MHA Last 10 Years 2011-2021 Question Papers (1st Sem, 2nd Sem, 3rd Sem And 4th Sem)


Rajiv Gandhi University of Health Sciences, Karnataka

IV Semester MBA Degree Examination

[Time: 3 Hours] [Max. Marks: 100]

--- Content provided by FirstRanker.com ---

HOSPITAL ADMINISTRATION

STRATEGIC MANAGEMENT AND PROJECT MANAGEMENT (RS-4)

Q.P. CODE: 8727

Your answers should be specific to the questions asked.

Draw neat, labeled diagrams wherever necessary.

--- Content provided by FirstRanker.com ---

LONG ESSAY 1 X 20 = 20 Marks

  1. Discuss the steps in strategic planning process. How to use expansion strategy to grow your sales? Discuss illustrate BCG growth share matrix.

SHORT ESSAY (Answer any Seven) 7 X 10 = 70 Marks

  1. Discuss the components of environment in detail. Write a note on importance of SWOT analysis in strategic planning.
  2. Write a note on Business level strategy. Mergers are the key part of corporate growth strategy. Discuss.
  3. --- Content provided by FirstRanker.com ---

  4. Discuss the different issues involved in strategic implementation. Write a note on the role of structural implementation in strategic implementation.
  5. What are the different steps involved in evaluation and control process? KRAs - a tool to boost up employee productivity. Comment
  6. What is project life cycle in project management? Why is work breakdown structure important?
  7. Discuss the significance of strategic management in an organization. Briefly explain the levels at which strategy operates.
  8. Discuss the importance of PERT and CPM in project management.
  9. --- Content provided by FirstRanker.com ---

  10. Describe why feasibility study is necessary in project development.

SHORT ANSWERS (Answer any Five) 05 X 02 = 10 Marks

  1. Define strategy.
  2. PEST analysis
  3. Procedural implementation
  4. --- Content provided by FirstRanker.com ---

  5. Operational control
  6. What is the difference between product management and project management?
  7. Business Intelligence
www.FirstRanker.com

--- Content provided by FirstRanker.com ---


This download link is referred from the post: RGUHS MHA Last 10 Years 2011-2021 Question Papers (1st Sem, 2nd Sem, 3rd Sem And 4th Sem)