FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU B-Tech EEE 2020 Dec 6th Sem 71154 Instrumentation In Power System Question Paper

Download PTU (I.K.Gujral Punjab Technical University (IKGPTU)) B-Tech (Bachelor of Technology) (EEE)- Electrical And Electronics Engineering 2020 December 6th Sem 71154 Instrumentation In Power System Previous Question Paper

This post was last modified on 13 February 2021

PTU B.Tech Question Papers 2020 December (All Branches)


FirstRanker.com

Total No. of Pages : 02
Total No. of Questions : 18

--- Content provided by⁠ FirstRanker.com ---

B.Tech. (EE) / (Electrical & Electronics) (2012 Onwards E-I)
(Sem.-6)
INSTRUMENTATION IN POWER SYSTEM
Subject Code : BTEE-605C
M.Code : 71154

--- Content provided by‍ FirstRanker.com ---

Time : 3 Hrs. Max. Marks : 60

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
  4. --- Content provided by⁠ FirstRanker.com ---

SECTION-A

Answer briefly :

  1. Differentiate between active and reactive power.
  2. Discuss the significance of instrumentation in power system.
  3. What is modulation index? Discuss.
  4. --- Content provided by‍ FirstRanker.com ---

  5. Compare PM and AM.
  6. Write down the advantages of digital transmission.
  7. Write down the errors that occur in telemetry system.
  8. Discuss the principle of energy meters.
  9. What do you mean by remote signaling? Explain.
  10. --- Content provided by‌ FirstRanker.com ---

  11. Explain the significance of transient response.
  12. What is the need of telemetry? Explain.

SECTION-B

  1. Explain (in detail) the measurement of any of the electrical quantities in power system.
  2. Explain (in detail) the working of a FM transmitter.
  3. --- Content provided by FirstRanker.com ---

  4. Discuss the concept of signal formation, conversion and transmission.
  5. Explain the function of SCADA system and remote terminal unit in detail.
  6. Discuss in detail the instrumentation used in thermal power plant.

SECTION-C

  1. Explain in detail the applications of SCADA system to Indian power systems.
  2. --- Content provided by​ FirstRanker.com ---

  3. Explain the pulse and digital telemetry methods in detail.
  4. Discuss the following :
    1. Instrument transformer
    2. Pulse Modulation

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.

--- Content provided by​ FirstRanker.com ---

FirstRanker.com



This download link is referred from the post: PTU B.Tech Question Papers 2020 December (All Branches)

--- Content provided by⁠ FirstRanker.com ---