Firstranker's choice
Roll No.
--- Content provided by FirstRanker.com ---
Total No. of Pages : 01
Total No. of Questions : 08
M.Tech.(CAD/CAM) (E-III) (Sem.-2)
MANAGEMENT OF PRODUCTION SYSTEMS
Subject Code : ME-516
--- Content provided by FirstRanker.com ---
M.Code: 23515
Time: 3 Hrs.
Max. Marks : 100
INSTRUCTION TO CANDIDATES :
- Attempt any FIVE questions out of EIGHT questions.
- Each question carries TWENTY marks.
--- Content provided by FirstRanker.com ---
Q1. What is meant by Facilities management and explain its benefits?
Q2. What is a job shop? Outline and describe the critical parameters of the job shop scheduling problem.
Q3. Explain the Concepts of :
a) PERT
--- Content provided by FirstRanker.com ---
b) CPM, by illustrating with examples and drawing the networks.
Q4. a) How does a good plant layout help to improve productivity?
b) Discuss the following statement "Some industries are located near the source of raw materials, whereas some near the markets for finished goods”.
Q5. a) Why is an ISO 9000 certification important to a firm? What are the advantages to the firm? Explain.
b) Is TQM more applicable in the manufacturing industry as compared to the service industry? Discuss.
--- Content provided by FirstRanker.com ---
Q6. Explain different types of internet B2B exchanges used for e-procurement. How do they improve the Production system?
Q7. Discuss role of Forecasting in Production system. Brief the forecasting methods.
Q8. Define Economic Order Quantity (EOQ). Explain with a suitable example along with its importance and limitations.
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.
1 M-23515
--- Content provided by FirstRanker.com ---
(S9)-1260
--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU M.Tech 3rd Semester Last 10 Years 2010-2020 Previous Question Papers|| Punjab Technical University