Firstranker's choice
Roll No.
--- Content provided by FirstRanker.com ---
Total No. of Questions : 18
Total No. of Pages : 02
BBA (2018 Batch) (Sem.-3)
PRODUCTION AND OPERATION MANAGEMENT
Subject Code : BBAGE301-18
--- Content provided by FirstRanker.com ---
M.Code: 76658
Time: 3 Hrs.
Max. Marks : 60
INSTRUCTIONS TO CANDIDATES :
- SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
- SECTION-B consists of FOUR Sub-sections : Units-I, II, III & IV.
- Each Sub-section contains TWO questions each, carrying TEN marks each.
- Students have to attempt any ONE question from each Sub-section.
--- Content provided by FirstRanker.com ---
SECTION-A
Write briefly :
--- Content provided by FirstRanker.com ---
- Operations management
- New product design
- Project production systems
- Product layout
- Capacity planning
- Kanban
- Value analysis
- Safety stock
- Reorder level
- Quality control
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
SECTION-B
UNIT-I
- Explain the need and steps involved in new product design.
- Explain the characteristics of batch manufacturing systems using a suitable example.
UNIT-II
--- Content provided by FirstRanker.com ---
- Explain location analysis techniques.
- Write a note on production planning and control.
UNIT-III
- Describe the relevance of TQM for modern production and operations. What is six sigma quality level?
- Explain the functions and methods of purchasing.
--- Content provided by FirstRanker.com ---
UNIT-IV
- What are Inventory Costs? Explain the classic EOQ model.
- Write a note on quality control initiatives in Indian organisations.
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.
--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU BBA 3rd Semester Last 10 Years 2011-2021 Previous Question Papers|| Punjab Technical University