FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTUH MCA 4th Sem R17 2019 April-May 844AG Aprilmay Software Process And Project Management Question Paper

Download JNTUH (Jawaharlal nehru technological university) MCA (Master of Computer Applications) 4th Sem (Fourth Semester) Regulation-R17 2019 April-May 844AG Aprilmay Software Process And Project Management Previous Question Paper

This post was last modified on 17 March 2023

JNTUH MCA 4th Sem Last 10 Years 2023-2013 Question Papers R20-R09 || Jawaharlal nehru technological university


FirstRanker.com

Code No: 844AG

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

--- Content provided by​ FirstRanker.com ---

MCA IV Semester Examinations, April/May - 2019

SOFTWARE PROCESS AND PROJECT MANAGEMENT

Time: 3hrs Max.Marks:75

Note:

This question paper contains two parts A and B.

--- Content provided by‌ FirstRanker.com ---

Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

PART - A

5 x 5 Marks =25

  1. a) What are the salient features of team software process? Compare with personal software process. [5]
  2. b) Differentiate between meta process and macro process. [5]
  3. --- Content provided by⁠ FirstRanker.com ---

  4. c) What is achieved by visible milestones in the life cycle? [5]
  5. d) List the responsibilities of software architecture team over the project life cycle. [5]
  6. e) Depict the real results of major mile stones in a modern process. [5]

PART -B

5 x 10 Marks =50

--- Content provided by⁠ FirstRanker.com ---

  1. Describe the six step process for improving the software process. [10]

    OR

  2. What are the characteristics of CMM level3 organization? Discuss the key actions required to advance to level 4 organizations. [10]
  3. Describe five improvements to the basic waterfall process that would eliminate most of the development risks. [10]

    OR

  4. --- Content provided by​ FirstRanker.com ---

  5. a) How are implementation sets are evaluated, assessed and measured?
    b) Elaborate primary evaluation criteria of inception phase. [5+5]
  6. What is meant by a workflow? What are the seven top-level workflows? Explain the relative levels of effort expected across the phases in these workflows. [10]

    OR

  7. a) Compare top-down and bottom-up approaches of project planning.

    --- Content provided by‌ FirstRanker.com ---

    b) What is the basic content of status assessment reviews? [5+5]
  8. The project organization represents the architecture of the team and needs to evolve consistent with the project plan captured in the work break down structure. Explain how the team’s centre of gravity shifts over the life cycle. [10]

    OR

  9. a) Discuss change traffic as a quality indicator.
    b) What are the goals of software metrics? [5+5]
  10. --- Content provided by⁠ FirstRanker.com ---

  11. How does a modern process framework exploit several critical approaches to resolve recurring issues in the conventional projects? Give illustrative example. [10]

    OR

  12. Demonstrate any five best practices for software project management. [10]

FirstRanker.com

---00000---

--- Content provided by⁠ FirstRanker.com ---



This download link is referred from the post: JNTUH MCA 4th Sem Last 10 Years 2023-2013 Question Papers R20-R09 || Jawaharlal nehru technological university

--- Content provided by​ FirstRanker.com ---