FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTUH MCA 4th Sem R15 2018 January 824AG Software Process And Project Management Question Paper

Download JNTUH (Jawaharlal nehru technological university) MCA (Master of Computer Applications) 4th Sem (Fourth Semester) Regulation-R15 2018 January 824AG Software Process And Project Management Previous Question Paper

This post was last modified on 17 March 2023

JNTUH MCA 4th Sem Last 10 Years 2023-2013 Question Papers R20-R09 || Jawaharlal nehru technological university


FirstRanker.com

Code No: 824AG

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

--- Content provided by⁠ FirstRanker.com ---

MCA IV Semester Examinations, January - 2018

SOFTWARE PROCESS AND PROJECT MANAGEMENT

Time: 3hrs Max.Marks:75

Note: This question paper contains two parts A and B.

Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

--- Content provided by‍ FirstRanker.com ---

PART - A 5 x 5 Marks = 25

  1. a) What are the improvements done to the basic waterfall model that would eliminate most of the development risks? [5]
  2. b) Give the top five principles of a modern process. [5]
  3. c) What are the primary objectives of inception phase? [5]
  4. d) What will be the impact of periodic status assessments on software project? [5]
  5. --- Content provided by⁠ FirstRanker.com ---

  6. e) List out the differences in workflow priorities between small and large projects. [5]

PART -B 5 x 10 Marks =50

  1. Describe the performance of conventional software project management. [10]

    OR

  2. What are the characteristics of a good estimate? Explain its role and significance in pragmatic software cost estimation. [10]
  3. --- Content provided by​ FirstRanker.com ---

  4. Explain the steps to improve team effectiveness with relevant examples. [10]

    OR

  5. Discuss the top risks involved in conventional software process and how can a modern software process resolves these risks. [10]
  6. Describe the differences in emphasis between engineering stage and production stage. [10]

    OR

  7. --- Content provided by​ FirstRanker.com ---

  8. a) Give typical release specification outline.
    b) Summarize the artifacts of the design set with neat UML diagram. [5+5]
  9. Describe the artifacts and life-cycle emphases associated with seven workflows of a software process. [10]

    OR

  10. a) What are the various levels of the evolutionary Work break down structure?

    --- Content provided by⁠ FirstRanker.com ---

    b) Discuss the activities of software architecture team. [5+5]
  11. a) What social factors are observed on software projects?
    b) Give life cycle overview of CCPDS-R project. [5+5]

    OR

  12. Explain about SLOC-to-ESLOC conversion factors that measures the performance of CEPDS-R project.
  13. --- Content provided by FirstRanker.com ---