MCA IV Semester Examinations, January - 2018
SOFTWARE PROCESS AND PROJECT MANAGEMENT
Time: 3hrs Max.Marks:75
Note: This question paper contains two parts A and B.
Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.
--- Content provided by FirstRanker.com ---
PART - A 5 x 5 Marks = 25
- a) What are the improvements done to the basic waterfall model that would eliminate most of the development risks? [5]
- b) Give the top five principles of a modern process. [5]
- c) What are the primary objectives of inception phase? [5]
- d) What will be the impact of periodic status assessments on software project? [5]
- e) List out the differences in workflow priorities between small and large projects. [5]
--- Content provided by FirstRanker.com ---
PART -B 5 x 10 Marks =50
- Describe the performance of conventional software project management. [10]
OR
- What are the characteristics of a good estimate? Explain its role and significance in pragmatic software cost estimation. [10]
- Explain the steps to improve team effectiveness with relevant examples. [10]
OR
- Discuss the top risks involved in conventional software process and how can a modern software process resolves these risks. [10]
- Describe the differences in emphasis between engineering stage and production stage. [10]
OR
- a) Give typical release specification outline.
b) Summarize the artifacts of the design set with neat UML diagram. [5+5] - Describe the artifacts and life-cycle emphases associated with seven workflows of a software process. [10]
OR
- a) What are the various levels of the evolutionary Work break down structure?
--- Content provided by FirstRanker.com ---
b) Discuss the activities of software architecture team. [5+5] - a) What social factors are observed on software projects?
b) Give life cycle overview of CCPDS-R project. [5+5]OR
- Explain about SLOC-to-ESLOC conversion factors that measures the performance of CEPDS-R project.
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
This download link is referred from the post: JNTUH MCA 4th Sem Last 10 Years 2023-2013 Question Papers R20-R09 || Jawaharlal nehru technological university
--- Content provided by FirstRanker.com ---