DR. BABASAHEB AMBEDKAR TECHNOLOGICAL UNIVERSITY, LONERE
End Semester Examination ? MAY 2019
Course: B. Tech in Civil Engineering Sem: 111
Subject Name: Building Construction
Subject Code: BTCVC305
Max Marks: 60 Date: 01/06/2019 Duration: 3 Hr.
Instructions to the Students:
1. Solve AN Y FIVE questions out of the following.
2. The level question/expected answer as per OBE or the Course Outcome (CO) on which the
question is based is mentioned in () in front of the question.
3 Use ofnon?programmable scienti?c calculators is allowed.
4. Assume suitable data wherever necessmy and mention it clearly.
Solve of the following.
Draw the neat plan and elevation (not to scale) of the following bonds
1. English bond - One Brick thick
2. English bond - One and halfbrick thick
3. English bond - two brick thick
Enlist the principles to be observed during construction of composite masonry?
Solve of the following.
Enlist the type of admixtures with functions.
Describe the factors affecting to the strength of concrete?
Solve Any Two of the following.
With neat sketch describe the technical terms used in arches?
I) Write down the difference between arches and lintels.
II) De?ne the primary and the secondary beam.
1) What is the requirement of good formwork?
11) What are the ?mctions of lime]?
Solve Any Two of the following.
Plan a dog legged stair for a building with the following data
i) Vertical distance between the floors = 3.6 M
ii) Size ofstajr hall = 2.5 M X 5 M
iii) Thickness of the ?oor slab = 140 MM
iv) Thickness of the waist slab and landing slab: 100 MM
What is the requirement of good staircase?
With neat sketch describe the technical terms used in door?
(Level/CO)
Analysis
Knowledge
Knowledge
Understand
Application
Analysis
Remem ber
Knowledge
Knowledge
Synthesis
Understand
Application
Marks
ONNNNON
Q. 5
A)
B)
Q. 6
A)
B)
unde?ned
Solve of the following.
State step by step procedure to construct concrete ?ooring for an industrial building.
Write down the construction details for the tile ?ooring.
Solve of the following.
What are the advantages and disadvantageous of precast structure?
Explain the concept of erection in precast building.
:?ca'c>': End ***