FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU MBA 2019 Winter 3rd Sem 4539252 Systems Analysis And Design Question Paper

Download GTU (Gujarat Technological University) MBA 2019 Winter 3rd Sem 4539252 Systems Analysis And Design Previous Question Paper

This post was last modified on 19 February 2020

GTU MBA Last 10 Years 2010-2020 Question Papers || Gujarat Technological University


FirstRanker.com

Seat No.:

Enrolment No.

--- Content provided by⁠ FirstRanker.com ---

GUJARAT TECHNOLOGICAL UNIVERSITY

MBA - SEMESTER- III EXAMINATION — WINTER 2019

Subject Code: 4539252

Subject Name: Systems Analysis and Design

Time: 10:30 AM TO 1.30 PM

--- Content provided by FirstRanker.com ---

Date:04-12-2019

Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. Make suitable assumptions wherever necessary.
  3. --- Content provided by‌ FirstRanker.com ---

  4. Figures to the right indicate full marks.

Q.1 Define following terms briefly: 14

  1. Structured English
  2. JAD
  3. Primitive DFD
  4. --- Content provided by⁠ FirstRanker.com ---

  5. Outsourcing
  6. Normalization
  7. Beta testing
  8. Reverse engineering

Q.2 (a) Explain the different phases in the SDLC and discuss what are the problems 07 associated with traditional waterfall approach of SDLC.

--- Content provided by‌ FirstRanker.com ---

(b) What do you mean by “System”? Discuss “Real” system & “Distributed” 07 system in detail. Also discuss boundaries of an IS.

OR

Q.2 (b) What do you mean by requirement determination? Discuss various traditional 07 methods for determining system requirements.

Q.3 (a) What is “Prototyping”? Explain difference between evolutionary and 07 throwaway prototyping.

(b) Explain various contemporary methods for system development. 07

--- Content provided by‍ FirstRanker.com ---

OR

Q.3 (a) Explain DFD & Context & level 0 diagrams with example. 07

(b) Describe various hardware devices for interacting with a system. Also 07 interpret; “One device is always better than all other”? Why or why not?

Q.4 (a) What do you mean by decision table? And explain the steps in creating a 07 decision table with an example.

(b) Define E-R modeling. Discuss Candidate keys & Identifiers with examples. 07

--- Content provided by‍ FirstRanker.com ---

OR

Q.4 (a) What are the different approaches to installation? Explain the most expensive 07 method and also discuss most risky method for the same?

(b) What is “System Analyst (SA)”? Discuss skills & responsibilities of SA. 07

FirstRanker.com

Q.5 Discuss the given case study with answers of following questions. 14

--- Content provided by​ FirstRanker.com ---

Hershey’s Chocolate Corporation

The company was founded in late 1880.

The brand name “Hershey Chocolate Corporation” was adopted in 1927 and, initially, it was a successful caramel-producing company. It was the first company that produced milk chocolate in America. With the passage to time, it focused only on chocolate production, and manufactured many innovative products. After the Second World War, it managed to export its products to 90 countries. In 2006, its sales reached 5 billion dollars, and employed over 14,300 people.

In 1996, with the aim of avoiding the familiar problems that could arise from their computational systems, due to the Y2K problems or the millennium bug, the administration of the company proceeded to the project “Enterprise 21.” Its main purpose was to replace its systems with the ERP system SAP R/3. This replacement was due to be completed by April 1999. The new system would help reorganize the company’s entrepreneurial operation, and provide data to suppliers and resellers, with a view to reducing storage and transportation costs, and providing better services to customers (Peperu and Gupta, 2008).

In July, 1999, orders dropped. Instead of 5 days, the company took 12 to deliver an order and, until August of the same year, the days went up to 15. The end result was that the company lost profits, credibility, and a prominent position on supermarket shelves (Peperu and Gupta, 2008). Yet, warehouses were full of products. In September, 2000, the company had 25% more merchandise in its warehouses than usual; but it failed to deliver it within time limit.

--- Content provided by‌ FirstRanker.com ---

Due to its failure, Hersey’s lost. 150 million dollars, its share dropped by 8 units in a day (when the company recognized there was a problem), and lost 0.5% of its market share in 1999.

One of the basic problems that led to the failure of the project was that part of the system took some time to materialize, which had as a result that the company implemented the method Bing Bang in July, 1999. According to Gross (201 1), there was a mistake in the selection of the project’s time frame, as well as the period during which it would be implemented. This period collided with the time when the company received an onslaught of orders in view of Halloween in America. The huge volume of works did not allow for the necessary controls or the appropriate training of staff. Furthermore, the company used, apart from its warechouses—upon the initiative of staff—, some offices and external warechouses as temporary storage places—things that the system could not take into consideration. According to many, the failure was due to administrative errors.

After changing its administration, the company proceeded to a new project in 2000 in order to materialize an ERP system. This was complete ahead of schedule, cost 20% less than the initial estimate, and was crowned with success.

Questions:

  1. According to you why initial project of ERP implantation failed?
  2. --- Content provided by FirstRanker.com ---

  3. If you were the manger, what precautions you should take before implementing any new software at your firm.

OR

Questions: 14

  1. Discuss various advantages that company can get after successful implementation of an ERP system?
  2. How can you use “Kurt Lewin’s Change Model” in this case? Briefly discuss.
  3. --- Content provided by‍ FirstRanker.com ---

FirstRanker.com



This download link is referred from the post: GTU MBA Last 10 Years 2010-2020 Question Papers || Gujarat Technological University

--- Content provided by⁠ FirstRanker.com ---