Download GTU MBA 2016 Winter 2nd Sem 2820006 Production And Operations Management Pom Question Paper

Download GTU (Gujarat Technological University) MBA (Master of Business Administration) 2016 Winter 2nd Sem 2820006 Production And Operations Management Pom Previous Question Paper

This post was last modified on 19 February 2020

GTU MBA Last 10 Years 2010-2020 Question Papers || Gujarat Technological University


FirstRanker.com

Q.1

Seat No.: Enrolment No.

--- Content provided by‌ FirstRanker.com ---

GUJARAT TECHNOLOGICAL UNIVERSITY

MBA - SEMESTER (02) - EXAMINATION - WINTER 2016

Subject Code: 2820006 Date: 25/10/2016

Subject Name: Production and Operations Management (POM)

Time: 10.30 am to 01.30 pm Total Marks: 70

--- Content provided by⁠ FirstRanker.com ---

Instructions:

  1. Attempt all questions.
  2. Make suitable assumptions wherever necessary.
  3. Figures to the right indicate full marks.

Objective Questions

--- Content provided by​ FirstRanker.com ---

  1. Process of designing products with less variability is known as
    A. Concurrent Engineering B. Robust Design
    C. Standardization D. Computer aided design
  2. Maximum output rate achieved under all the constraint in manufacturing is known as
    A. Effective capacity B. Designed Capacity

    --- Content provided by FirstRanker.com ---

    C. Actual Capacity D All of the above
  3. Slack of an event in project management is
    A. Latest occurrence time of B. Earliest occurrence time of event- Latest
    event- Earliest Occurrence Occurrence time of event
    time of event

    --- Content provided by FirstRanker.com ---

    C. Latest occurrence time of D. None of the above
    event- (Earliest Occurrence
    time of event + Float)
  4. Stock of inventory stored to meet an inventory cycle determined by an inventory model is known as
    A. Cycle stock B. Buffer stock

    --- Content provided by‌ FirstRanker.com ---

    C. Anticipation inventory D: All of the above
  5. Consumption value CV is
    A. CV =Unit Price of item X B. CV = Unit Price of item x Cycle stock
    number of units consumed
    C. CV =Unit Price of item x D. None of the above

    --- Content provided by‍ FirstRanker.com ---

    safety stock
  6. To measure the production process capability with customer specification , what is being used ?
    A. Inventory ratio B. Process Capability ratio
    C. Profitability ratio D. Current liabilities.

Q.1 (b) Define following 06

--- Content provided by FirstRanker.com ---

  1. Optimistic time with respect to project management
  2. Most likely time with respect to project management
  3. Lead time in inventory management
  4. Early start and Early Finish time

Q.1 (c) Differentiate between Fixed — Position layout Vs. Cellular layout and group technology 04

--- Content provided by​ FirstRanker.com ---

Q.2 (a) Describe a problems can occur to the business house , due to improper facility location planning. 04

(b) What are control charts? Explain X Bar chart and R chart with necessary formulas and example. How it is useful for manufacturing process? 07

OR

FirstRanker.com

Q.3 (a) Write a note on Total quality management tools (TQM tools) with suitable examples. 07

--- Content provided by FirstRanker.com ---

Q.3 (b) Write a note on process layout , explain the layouts with suitable examples 07

Q.4 (a) For following activities in a project management, Draw network diagram find out critical path , early start and early finish points. 07

Task Time (Days Predecessors
A 2
B 3
C 4
D 1
E 2 D
F 5 E
G 7 F
H 2 F,G
I 3 H,I
J 1

OR

Q.4 (b) Write a note on Program evaluation and Review technique and role of Beta curve in the same. 07

Q.5 (a) Legend bikes limited resources 6000 side mirrors for it’s bikes from an outside suppliers. The operating cost is Rs. 10/- per order and CC is Rs. 6 per unit per year. The company has a 300 working days cycle per year. Find out following 07

--- Content provided by⁠ FirstRanker.com ---

(a) EOQ, (b) Number of orders per year (c) Total inventory cost (d) Number of iventory cycles in a year.

Q.5 (b) Explain inventory cycle, EOQ (Economic OrderQuantity ) and EOQ with safety stock considerations. 07

Q.5 (a) Write a note on Just In time method of inventory management and also explain merits and demerits of the same. Write a note about the' situations where just in time method may not be suitable to adopt. 07

OR

Q.5 (b) Write a note on operations strategies for multiple facilities. 07

--- Content provided by‍ FirstRanker.com ---

Q.5 (a) Write a differentiating note between Kaizen and Kanban Visiual systems with suitable examples with respect to manufacturing process. 14

Q.5 (b) A leading car manufacturing company decided to have their new manufacturing plant at West Bengal state of India with an intention of manufacturing the lowest cost car , making it affordable for everyone . Project execution team of the company started setting up manufacturing facilities on war footing basis and almost after 50% work was done and 60% time was consumed, due to the political and legal environment of the business , Car company had to stop the execution of the project.

After loosing few more weeks as a part of conflict resolution mechanism , both the government officials and company authorities came to the conclusion that project will not be able to take shape at this state and will not get executed further on that land.

After loosing sizable time and resources, company decided to shift the manufacturing facility to another state (Gujarat). After doing so, the major challenge company’s board of director were facing that of , having production setting up manufacturing process .

The other major challenge was, as sizable resources (capital mainly) were lost the process, Producing the car at the lowest cost was another major challenge they were facing.

--- Content provided by FirstRanker.com ---

Third and important challenge for the company officials was to maintain the consistency in quality — in spite of expediting manufacturing plant execution process and dropping the cost at every stage.

Keeping the three challenges in the mind answer the following questions.

  1. How project management concept will help in addressing the problem of execution of the plant in a very short span of time?
  2. How inventory management tools will help in dropping the cost?
  3. Which quality tools the company will have to ensure the consistent quality to have required quality product at lower cost?
  4. --- Content provided by⁠ FirstRanker.com ---

OR

Flag bearings has been indenting 20,000 bearings rollers every year form the supplier, Rotomac rollers. The OC is Rs. 100 and CC is Rs.1 per unit per year. The price of roller is Rs.5.0 and supplier offers a 5% discount if the purchases are made in a lots of 10,000 rollers or more. Determine whether a discount model is more preferable or EOQ model?



--- Content provided by‍ FirstRanker.com ---