FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Winter 6th Sem New 2161709 Programmable Logic Controller Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Winter 6th Sem New 2161709 Programmable Logic Controller Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER- VI (New) EXAMINATION - WINTER 2019

--- Content provided by⁠ FirstRanker.com ---

Subject Code: 2161709 Date: 11/12/2019
Subject Name: Programmable Logic Controller
Time: 02:30 PM TO 05:00 PM Total Marks: 70

Instructions:
1. Attempt all questions.

--- Content provided by‍ FirstRanker.com ---

2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

Q.1 (a) Implement the ladder diagram for 4 to 1 multiplexer. 03
(b) In drawing room there are three fans (P, Q, R), each having its own start 04 and stop pushbuttons. Any one or two fans may run at a time (i.e. all three fans cannot run at a time). Implement this system in PLC ladder diagram.
(c) A parking lot is automated with a PLC which counts the number of cars 07 that enter and exit and if the parking lot is about to be full, PLC sends a Red light signal to say that the parking is full. The capacity of this parking lot is assumed to be 100 cars. When there are less than 100 but more than 50 cars in the parking lot, Green light remains on. When there are less than 51 and more than 0 cars in the lot, blue light remains on. At a time not more than one light remains on. Draw PLC ladder diagram.

--- Content provided by‍ FirstRanker.com ---

Q.2 (a) Develop a ladder diagram of OR and EX-OR Logic gates. 03
(b) Implement the following Boolean equations in PLC ladder diagrams. 04
(i) Y=(AB’+A’B)C
(ii) Z=(P+Q+R).(D+E).G’.H
(c) For the wood cutting application when switch IN001 is on, both the 07 saw (Output A) and the blower (Output B) go on at the same time. The saw goes off after 20 seconds and the blower continues to run till the system is turned off by switches. Draw timing diagram of the system.

--- Content provided by FirstRanker.com ---

OR

(c) Two liquids A and B have to be taken in equal quantities in one tank 07 when START pushbutton is pressed. Stir the mixture for 30 minutes using motor operated stirrer. Then open the drain valve for 60 minutes to let out the mixture. Keep provision of emergency STOP button X0 to disable all the outputs and to stop the system running.
Include red pilot light for system on and green pilot light when tank is fully drained.
Draw the operation layout of the system, list procedural steps, inputs and outputs of the system. Draw PLC ladder diagram of the system.

Q.3 (a) What is the importance of PLC scanning? Explain PLC scanning with 03 the help of necessary figures.

--- Content provided by​ FirstRanker.com ---

(b) Draw block diagram of PLC system and explain it. 04
(c) There are three conveyors A, B, and C. Sensors are connected to each 07 conveyor. Packed boxes having 5, 10, and 15 number of soaps pass through conveyor A, B and C, respectively. Find the total number of soaps produced in one hour and store it in holding registers HR100 and HR101 of PLC. Assume no overflow in registers.

OR

FirstRanker.com

(a) Explain the function of 2 analog input devices that can read analog 03 devices, and 2 analog output devices that can be connected to a PLC.

--- Content provided by‌ FirstRanker.com ---

(b) Explain solid state memory organization in PLC with the help of 04 memory map.
(c) Draw and explain basic two-axis pick and place robot with PLC 07 sequencer control.

Q.4 (a) Explain SKIP function of PLC with example. 03
(b) Draw and explain Input module of PLC. 04
(c) The linear input of 0 to 80 volts is to be displayed on a 9999-maximum 07 count BCD output. Assume input module volts 0 to 5 volts, 128 steps binary. Trace 32 volts through the PLC system (input signal, conversion, input module, CPU, output module etc) and draw it.

--- Content provided by⁠ FirstRanker.com ---

OR

Q.4 (a) Explain MCR instruction of PLC. 03
(b) Explain TABEL-TO-REGISTER (TR) MOVE function of PLC. 04
(c) Two linear input signals of 0 to 4 volts are to be multiplied and the result 07 put out on a linear output of 0 to 150 volts. Trace the numbers through PLC system if the inputs are 2.85 and 3.45 volts.

Q.5 (a) List major considerations in choosing a fuse for PLC. 03

--- Content provided by⁠ FirstRanker.com ---

(b) Write a brief note on PLC network communication. 04
(c) List various shift register functions of PLC and explain any two of them 07 in detail.

OR

Q.5 (a) List out various PLC manufacturer brand. 03
(b) What is the use of interrupt instructions in PLC? Explain any one 04 instruction.

--- Content provided by⁠ FirstRanker.com ---

(c) Explain PLC sequencer functions in detail with application. 07