GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER- VIII (New) EXAMINATION — WINTER 2019
--- Content provided by FirstRanker.com ---
Subject Code: 2180807 Date: 27/11/2019Subject Name: Industrial Automation
Time: 02:30 PM TO 05:00 PM Total Marks: 70
Instructions:
- Attempt all questions.
- Make suitable assumptions wherever necessary.
- Figures to the right indicate full marks.
--- Content provided by FirstRanker.com ---
- (a) Block diagram of PLC. 03
(b) Explain ladder diagram elements. 04 - (a) What is automation? Explain generalized automation, production systems and their classification. 07
--- Content provided by FirstRanker.com ---
- (a) Define the following: 03
(1) Error (2) Dead Time (3) Cycling - (b) Discuss briefly about Intelligent Controllers. 04
- (c) Explain various types of I/O Modules and Explain the Layout of I/O separately connected to PLC. 07
- (a) Explain roll of Common system components of SCADA. 03
- (b) Define following terms with respect to Process control: 04
(1) Variable Range (2) Neutral Zone (3) Control Lag. - (c) Explain the concept of Production system with its Block diagram. 07
OR
--- Content provided by FirstRanker.com ---
- (a) Explain the block diagram of distributed control system (DCS). 03
- (b) What is floating mode control? Explain Single speed floating mode control 04
- (c) Discuss importance of Local Area Network for DCS. 07
--- Content provided by FirstRanker.com ---
OR
- (a) Develop ladder diagram for Traffic Control Signals. 03
- (b) Explain PI Controller application. 04
- (c) Explain Timer and Counter instructions for PLC 07
- (a) Explain the Proportional Integral Derivative (PID) controller mode with suitable example. 03
- (b) Give the Introduction about CNC machine. 04
- (c) Explain following discontinuous controller modes : 07
--- Content provided by FirstRanker.com ---
(1) Two position mode (i1) Multi position mode.
--- Content provided by FirstRanker.com ---
OR
- (a) Explain Direct Digital Control in detail with suitable diagram. 03
- (b) Explain Application, Advantage and Disadvantage of Hydraulic system. 04
- (c) Explain Pneumatic control System 07
- (a) Develop ladder diagram for bottle filling conveyor belt. 03
- (b) Define following Process Characteristics: 04
1) Process Equation 2) Process Load 3) Process Lag - (c) Discuss relative merits & demerits of PLC & DCS. 07
OR
--- Content provided by FirstRanker.com ---
- (a) Explain SCADA with suitable diagram. 07