FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Summer 5th Sem New 2152205 Advance Mine Surveying Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 5th Sem New 2152205 Advance Mine Surveying Previous Question Paper

This post was last modified on 20 February 2020

GTU BE 2019 Summer Question Papers || Gujarat Technological University


FirstRanker.com

Subject Code: 2152205

GUJARAT TECHNOLOGICAL UNIVERSITY

--- Content provided by⁠ FirstRanker.com ---

BE - SEMESTER-V (NEW) EXAMINATION - SUMMER 2019

Subject Name: Advance Mine Surveying

Time: 02:30 PM TO 05:00 PM

Instructions:

  1. Attempt all questions.
  2. --- Content provided by⁠ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.
    1. Define curve ranging. Explain direct and indirect method of curve ranging. (03)
    2. Describe the various uses of gyroscope. (04)
    3. Explain the element of compound curve with neat sketch. (07)
    4. --- Content provided by‌ FirstRanker.com ---

    1. Define Photogrammetry. Differentiate between terrestrial and aerial Photogrammetry. (03)
    2. Define correlation survey. Enumerate the different methods of correlation surveys. (04)
    3. Define GIS. Write their components and give the application of GIS. (07)

    OR

    --- Content provided by FirstRanker.com ---

    1. Define GPS. Explain various measurements techniques with GPS. (07)
    2. Discuss the advantages of Photogrammetry. (03)
    3. Describe the field work of Terrestrial Photogrammetry. (04)
    1. Describe the coplaning method of correlation survey of a mine. Explain precautions to be taken in work. (07)
    2. --- Content provided by⁠ FirstRanker.com ---

    3. Discuss the various purposes of correlation surveying in mines. (03)
    4. Discuss the advantages of Aerial Photogrammetry. (04)

    OR

    1. Describe a method of connecting the surface with the survey of underground workings of a mine when only one shaft is available for survey work. Explain precautions to be taken in work. (07)
    2. List out different methods of setting out curves. (03)
    3. --- Content provided by‍ FirstRanker.com ---

    4. Explain the various stages of Aerial Photogrammetry. (04)
    1. Explain setting out of curves by chords and offsets method. (07)
    2. Describe various uses of Miner’s Dial. (03)
    3. Describe various general requirements about mine plans. (04)
    4. --- Content provided by⁠ FirstRanker.com ---

    OR

    1. Explain setting out of curves by chords and angles method. (07)
    2. What is tape triangulation of stope survey? When it is used? (03)
    3. Explain Planimeter and its uses. (04)
  1. --- Content provided by​ FirstRanker.com ---

    1. Define dip and fault. Explain various types of fault with neat sketches. (07)
    2. Discuss the uses of ediograph and pentagraph in preparation of mine plans and section. (03)
    3. Explain how to represent geological and other features in mine plans and section. (04)

    OR

    1. Explain the correlation survey by magnetic needle. (07)
    2. --- Content provided by FirstRanker.com ---

Date: 03/06/2019

Total Marks: 70


--- Content provided by‍ FirstRanker.com ---


This download link is referred from the post: GTU BE 2019 Summer Question Papers || Gujarat Technological University