FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Summer 6th Sem New 2162505 Estimating And Costing Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 6th Sem New 2162505 Estimating And Costing Previous Question Paper

This post was last modified on 20 February 2020

GTU BE 2019 Summer Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER-VI(NEW) — EXAMINATION - SUMMER 2019

--- Content provided by⁠ FirstRanker.com ---

Subject Code:2162505 Date:16/05/2019

Subject Name:Estimating and Costing

Time:10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by​ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

Q.1 (a) Define cost accounting. Give objective of cost accounting. 03

(b) Discuss various techniques of cost control. 04

(c) Explain importance of accurate estimating with example. 07

--- Content provided by FirstRanker.com ---

Q.2 (a) Define Estimating. Discuss step by step estimating procedure. 03

(b) Explain methods to calculate areas of irregular figures. 04

(c) Discuss constituents of estimation. 07

OR

(c) Define mensuration. Give importance of mensuration. 07

--- Content provided by‍ FirstRanker.com ---

Q.3 (a) Enlist and explain any three methods of on cost allocation. 03

(b) Discuss the main functions of an estimator. 04

(c) Give main aims of estimating. 07

OR

Q.3 (a) Differentiate day rate and piece rate. 03

--- Content provided by‌ FirstRanker.com ---

(b) Give the difference between estimating and costing. 04

(c) Write a note on how to control over material cost. 07

Q.4 (a) Define spoilage 03

(b) Give advantages of efficient costing. 04

(c) Enlist various cost included for estimation of arc welding. 07

--- Content provided by‌ FirstRanker.com ---

OR

Q.4 (a) Give objective of labour costing. 03

(b) Explain various types of wages 04

(c) Define incentives. Explain non financial incentives. 07

Q.5 (a) Enlist various operation in sheet metal shop. 03

--- Content provided by⁠ FirstRanker.com ---

(b) How we can estimate total time for knurling operation? 04

(c) Discuss various types of sheet metal joints with sketch. 07

OR

Q.5 (a) Discuss estimation of pattern cost and estimation in foundry shop. 03

(b) Enlist factors which influence wages. 04

--- Content provided by​ FirstRanker.com ---

(c) Discuss various important methods used to calculating areas of irregular figures. 07

FirstRanker.com



--- Content provided by FirstRanker.com ---

This download link is referred from the post: GTU BE 2019 Summer Question Papers || Gujarat Technological University