Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2171910 Date:21/05/2019

Subject Name:Power Plant Engineering

Time:02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.



MARKS

Q.1 (a) Draw general layout of modern thermal power plant and labelled its
components.
03
(b) List the different methods used to control the superheat temperature of
steam and explain any one method in details.
04
(c) What is compounding? Explain working principle of pressure
compounding with neat sketch.
07

Q.2 (a) State the advantages and disadvantages of pressurized fluidized bed
combustion boiler.
03
(b) List down the requirements of good ash handling system. 04
(c) Explain with neat sketch construction and working Benson boiler and state
its advantages.
07
OR
(c) Air enters to compressor of gas turbine plant operating on Brayton cycle
at 100 kPa and 300 K with a volumetric flow rate of 5 m
3
/ sec. the
compression pressure ratio is 10. The turbine inlet temperature is 1300 K.
The turbine and compressor has an isentropic efficiency of 0.82 and 0.8
respectively. Calculate
1) Thermal efficiency of the cycle
2) Back work ratio
3) Net power developed in kW
Assume Cp =1.005 kJ/kg and ?=1.4 for air and gases.
07
Q.3 (a) State the advantage of mechanical draught over natural draught. 03
(b) State the requirements of pulverized coal burners. 04
(c) Explain the working of electrostatic precipitator with neat sketch. 07
OR
Q.3 (a) What is the necessity of cooling tower in a steam power plant? 03
(b) Differentiate between ramjet engine and pulsejet engine. 04
(c) A mean blade ring diameter of a single stage impulse turbine is 1.3 meter.
It runs at 3200 R.P.M. The nozzle angle is 15
0
and blade speed ratio is
0.45. The blade friction factor is 0.9 and the discharge is axial. calculate
blade inlet and outlet angles and power output per kg of steam.
07
Q.4 (a) Explain the role of boiler feed water pH in corrosion of boiler tubes. 03
(b) Differentiate between throttle governing and nozzle control governing. 04
(c) Derive expression for mass flow rate of steam through nozzle. 07
OR
FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2171910 Date:21/05/2019

Subject Name:Power Plant Engineering

Time:02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.



MARKS

Q.1 (a) Draw general layout of modern thermal power plant and labelled its
components.
03
(b) List the different methods used to control the superheat temperature of
steam and explain any one method in details.
04
(c) What is compounding? Explain working principle of pressure
compounding with neat sketch.
07

Q.2 (a) State the advantages and disadvantages of pressurized fluidized bed
combustion boiler.
03
(b) List down the requirements of good ash handling system. 04
(c) Explain with neat sketch construction and working Benson boiler and state
its advantages.
07
OR
(c) Air enters to compressor of gas turbine plant operating on Brayton cycle
at 100 kPa and 300 K with a volumetric flow rate of 5 m
3
/ sec. the
compression pressure ratio is 10. The turbine inlet temperature is 1300 K.
The turbine and compressor has an isentropic efficiency of 0.82 and 0.8
respectively. Calculate
1) Thermal efficiency of the cycle
2) Back work ratio
3) Net power developed in kW
Assume Cp =1.005 kJ/kg and ?=1.4 for air and gases.
07
Q.3 (a) State the advantage of mechanical draught over natural draught. 03
(b) State the requirements of pulverized coal burners. 04
(c) Explain the working of electrostatic precipitator with neat sketch. 07
OR
Q.3 (a) What is the necessity of cooling tower in a steam power plant? 03
(b) Differentiate between ramjet engine and pulsejet engine. 04
(c) A mean blade ring diameter of a single stage impulse turbine is 1.3 meter.
It runs at 3200 R.P.M. The nozzle angle is 15
0
and blade speed ratio is
0.45. The blade friction factor is 0.9 and the discharge is axial. calculate
blade inlet and outlet angles and power output per kg of steam.
07
Q.4 (a) Explain the role of boiler feed water pH in corrosion of boiler tubes. 03
(b) Differentiate between throttle governing and nozzle control governing. 04
(c) Derive expression for mass flow rate of steam through nozzle. 07
OR
2
Q.4 (a) Define following term: 1) Vacuum efficiency 2) Condenser
efficiency
03
(b) Draw the P-V and T-S diagram of ideal Brayton cycle. 04
(c) Write short note on sodium zeolite ion exchange process. 07
Q.5 (a) Write down the function of following components of nuclear reactor :1)
Moderator 2) Control rod
03
(b) Give detailed classification of steam turbines. 04
(c) Write short note on fast breeder reactor. 07
OR

Q.5 (a) Define following terms as applied to jet propulsion:
1) Thrust 2) Propulsive power
03
(b) Define following terms: 1) Connected Load 2) diversity Factor 04
(c) Calculate the cost of generation per kWhr for a power station having
following data:
Installed capacity of plant = 200 MW
Capital cost = Rs. 400 crores
Rate of interest and depreciation = 12 %
Annual cost of fuel, salaries and taxation = Rs. 5 crores
Load factor = 50%


07

*************