FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Summer 7th Sem New 2171910 Power Plant Engineering Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 7th Sem New 2171910 Power Plant Engineering Previous Question Paper

This post was last modified on 20 February 2020

GTU BE 2019 Summer Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-VII(NEW) EXAMINATION — SUMMER 2019

--- Content provided by​ FirstRanker.com ---

Subject Code:2171910 Date:21/05/2019
Subject Name:Power Plant Engineering
Time:02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by‍ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

MARKS

Q.1 (a) Draw general layout of modern thermal power plant and labelled its components. 03

(b) List the different methods used to control the superheat temperature of steam and explain any one method in details. 04

--- Content provided by FirstRanker.com ---

(c) What is compounding? Explain working principle of pressure compounding with neat sketch. 07

Q.2 (a) State the advantages and disadvantages of pressurized fluidized bed combustion boiler. 03

(b) List down the requirements of good ash handling system. 04

(c) Explain with neat sketch construction and working Benson boiler and state its advantages. 07

OR

--- Content provided by FirstRanker.com ---

(c) Air enters to compressor of gas turbine plant operating on Brayton cycle at 100 kPa and 300 K with a volumetric flow rate of 5 m3/ sec. the compression pressure ratio is 10. The turbine inlet temperature is 1300 K. The turbine and compressor has an isentropic efficiency of 0.82 and 0.8 respectively. Calculate 07

  1. Thermal efficiency of the cycle
  2. Back work ratio
  3. Net power developed in kW

Assume Cp =1.005 kJ/kg and ? =1.4 for air and gases.

--- Content provided by‌ FirstRanker.com ---

Q.3 (a) State the advantage of mechanical draught over natural draught. 03

(b) State the requirements of pulverized coal burners. 04

(c) Explain the working of electrostatic precipitator with neat sketch. 07

OR

Q.3 (a) What is the necessity of cooling tower in a steam power plant? 03

--- Content provided by⁠ FirstRanker.com ---

(b) Differentiate between ramjet engine and pulsejet engine. 04

(c) A mean blade ring diameter of a single stage impulse turbine is 1.3 meter. It runs at 3200 R.P.M. The nozzle angle is 15° and blade speed ratio is 0.45. The blade friction factor is 0.9 and the discharge is axial. calculate blade inlet and outlet angles and power output per kg of steam. 07

Q.4 (a) Explain the role of boiler feed water pH in corrosion of boiler tubes. 03

(b) Differentiate between throttle governing and nozzle control governing. 04

(c) Derive expression for mass flow rate of steam through nozzle. 07

--- Content provided by⁠ FirstRanker.com ---

OR

(a) Define the following efficiencies 1) Boiler efficiency 2) Condenser efficiency 03

(b) Draw the P-V and T-S diagram of ideal Brayton cycle. 04

(c) Write short note on sodium zeolite ion exchange process. 07

Q.5 (a) Write down the function of following components of nuclear reactor :1) Moderator 2) Control rod 03

--- Content provided by FirstRanker.com ---

(b) Give detailed classification of steam turbines. 04

(c) Write short note on fast breeder reactor. 07

OR

Q.5 (a) Define following terms as applied to jet propulsion: 1) Thrust 2) Propulsive power 03

(b) Define following terms: 1) Connected Load 2) diversity Factor 04

--- Content provided by‌ FirstRanker.com ---

(c) Calculate the cost of generation per kWhr for a power station having following data: 07

Installed capacity of plant =200 MW
Capital cost = Rs. 400 crores
Rate of interest and depreciation =12%
Annual cost of fuel, salaries and taxation = Rs. 5 crores

--- Content provided by⁠ FirstRanker.com ---

Load factor =50%