Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VIII (OLD) EXAMINATION ? SUMMER 2019
Subject Code: 180603 Date: 13/05/2019

Subject Name:Professional Practice & Valuation

Time: 10:30 AM TO 01:30 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.


Q.1 The plan of a residential building is shown in Figure-1. Calculate quantity of
following items in a quantity sheet. Adopt suitable brief specifications.
1. Excavation in foundation.
2. Plain Cement Concrete (P.C.C.) in foundation in 1:3:6.
3. Brickwork in foundation
4. Brickwork in super structure in cement mortar 1:4.
5. R.C.C. work in Slab, Chhajja and Lintel (bearing 15cm).
14

Q.2 (a) Adopt suitable rates and prepare abstract sheet for the items calculated in
Question 1. Also list the factors affecting the rate of items at any place.
07
(b) Define specification. What are the purposes of writing specifications? Also state
importance of it.
07
OR
(b) Write detailed specifications of following items (Any two)
1. Earthwork in excavation.
2. First class brickwork in cement mortar 1:4 in super structure.
07

Q.3 (a) What is the significance of market survey in civil engineering? How the rate of an
item is derived by method of rate analysis?
07
(b) Define contract. Explain (i) Turn key contract (ii) Labour contract and
(iii) Item rate contract
07
OR
Q.3 (a) Calculate following.
1. No. of bricks required for 1 cu.m. Brickwork.
2. No. of cement bags for 1 cu.m. Brickwork in cement mortar 1:4.
3. Quantity of sand for 1 cu.m. PCC in Cement mortar 1:1.5:3
07
(b) What is tender? Give detailed classification of tenders. 07

Q.4 (a) Find the rate of Plain Cement Concrete (1:2:4) per cu. m. by Rate analysis.
Assume suitable rates of material and labour.
07
(b) Explain following related to contract
(1) Earnest Money Deposit (EMD) (2) Security Deposit (3) Liquidated Damage.
07
OR
Q.4 (a) Enlist and explain different methods of valuation. 07
(b) Explain (i) Detailed Estimate (ii) Supplementary Estimate 07

Q.5 (a) Write short note on Scrutiny of tenders. 07
(b) Differentiate between
(i) Free hold property & Lease hold property.
(ii) Depreciation & obsolescence.
07





FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VIII (OLD) EXAMINATION ? SUMMER 2019
Subject Code: 180603 Date: 13/05/2019

Subject Name:Professional Practice & Valuation

Time: 10:30 AM TO 01:30 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.


Q.1 The plan of a residential building is shown in Figure-1. Calculate quantity of
following items in a quantity sheet. Adopt suitable brief specifications.
1. Excavation in foundation.
2. Plain Cement Concrete (P.C.C.) in foundation in 1:3:6.
3. Brickwork in foundation
4. Brickwork in super structure in cement mortar 1:4.
5. R.C.C. work in Slab, Chhajja and Lintel (bearing 15cm).
14

Q.2 (a) Adopt suitable rates and prepare abstract sheet for the items calculated in
Question 1. Also list the factors affecting the rate of items at any place.
07
(b) Define specification. What are the purposes of writing specifications? Also state
importance of it.
07
OR
(b) Write detailed specifications of following items (Any two)
1. Earthwork in excavation.
2. First class brickwork in cement mortar 1:4 in super structure.
07

Q.3 (a) What is the significance of market survey in civil engineering? How the rate of an
item is derived by method of rate analysis?
07
(b) Define contract. Explain (i) Turn key contract (ii) Labour contract and
(iii) Item rate contract
07
OR
Q.3 (a) Calculate following.
1. No. of bricks required for 1 cu.m. Brickwork.
2. No. of cement bags for 1 cu.m. Brickwork in cement mortar 1:4.
3. Quantity of sand for 1 cu.m. PCC in Cement mortar 1:1.5:3
07
(b) What is tender? Give detailed classification of tenders. 07

Q.4 (a) Find the rate of Plain Cement Concrete (1:2:4) per cu. m. by Rate analysis.
Assume suitable rates of material and labour.
07
(b) Explain following related to contract
(1) Earnest Money Deposit (EMD) (2) Security Deposit (3) Liquidated Damage.
07
OR
Q.4 (a) Enlist and explain different methods of valuation. 07
(b) Explain (i) Detailed Estimate (ii) Supplementary Estimate 07

Q.5 (a) Write short note on Scrutiny of tenders. 07
(b) Differentiate between
(i) Free hold property & Lease hold property.
(ii) Depreciation & obsolescence.
07





2


OR
Q.5 Write short notes on following (Any four)
1. Use of Valuation tables.
2. Material At Site (MAS) account.
3. Types of value.
4. Easement.
5. Measurement book (MB).
14

*************