FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2018 Winter 5th Sem New 2153202 Software Engineering Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 5th Sem New 2153202 Software Engineering Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


FirstRanker.com

Subject Code: 2153202

GUJARAT TECHNOLOGICAL UNIVERSITY

--- Content provided by‌ FirstRanker.com ---

BE - SEMESTER-V (NEW) EXAMINATION - WINTER 2018
Subject Name: Software Engineering
Time: 10:30 AM TO 01:00 PM

Instructions:

1. Attempt all questions.

--- Content provided by FirstRanker.com ---

2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

  1. Q.1 (a) Explain Software Characteristics in detail. [03]
    (b) Define Software Engineering. Draw and explain Software Engineering layers. [04]
    (c) Explain various categories of Software in Detail. [07]

    --- Content provided by FirstRanker.com ---

  2. Q.2 (a) Compare Waterfall Model and Spiral Model in Software Engineering. [03]
    (b) Explain Spiral Model in Detail. State its Advantages and Disadvantages. [04]
    (c) Discuss umbrella activities and its role in software development life cycle (SDLC). [07]

    OR

    --- Content provided by FirstRanker.com ---

    (a) Explain different tasks of Project Manager in Detail. [03]
    (b) Explain Different Metrics —Size, Functional and complexity [04]
    (c) Discuss all process Framework activities of Software Engineering. [07]

  3. Q.3 (a) Explain W5HH Principle in detail. [03]

    --- Content provided by FirstRanker.com ---

    (b) What is System testing and Recovery Testing? [04]
    (c) Explain Cohesion and Coupling for Software Design. [07]

    OR

    (a) Define FOUR Ps for project management and explain them in detail. [03]
    (b) Explain Alpha and Beta Testing in detail [04]

    --- Content provided by‍ FirstRanker.com ---

    (c) Prepare ER diagram for Payroll Management System. [07]

  4. Q.4 (a) What is Importance of User Interface? Explain Concept of UI. [03]
    (b) Differentiate Reactive Vs Proactive Risks. [04]
    (c) Describe the difference between risk components and risk drivers. [07]

    --- Content provided by‌ FirstRanker.com ---

    OR

    (a) What is Risk Management? Explain RMMM plan. [03]
    (b) Explain Scheduling with Time line chart. [04]
    (c) Prepare DFD for Library Management System. [07]

  5. --- Content provided by​ FirstRanker.com ---

  6. Q.5 (a) What is Software Quality Assurance? Explain various factors that affect Software Quality. [03]
    (b) What are the steps in software Project Planning? What is effort estimation? [04]
    (c) Prepare DFD for Employee Attendance System. [07]

    OR

    (a) What do you mean by debugging? Explain various debugging approaches. [03]

    --- Content provided by‍ FirstRanker.com ---

    (b) N/A [04]
    (c) N/A [07]

Date: 16/11/2018
Total Marks: 70

--- Content provided by⁠ FirstRanker.com ---



This download link is referred from the post: GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University

--- Content provided by‍ FirstRanker.com ---