GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-III (New) EXAMINATION — WINTER 2018
Subject Name: Basic Engineering in Textile
Time: 10:30 AM TO 01:00 PM
--- Content provided by FirstRanker.com ---
Instructions:
- Attempt all questions.
- Make suitable assumptions wherever necessary.
- Figures to the right indicate full marks.
Q1
--- Content provided by FirstRanker.com ---
(a) Differentiate between fire tube boiler and water tube boiler. [03]
(b) Define maintenance. What are the types of maintenance? [04]
(c) Explain basic steps in Method Study by algorithm. [07]
Q2
(a) Give the detail classification of boiler. [03]
--- Content provided by FirstRanker.com ---
(b) Advantages and disadvantages of water tube boiler over the fire tube boiler. [04]
(c) Describe the Hungarian method procedure for Assignment problem in detail. [07]
OR
(c) Use graphical method to solve following LPP.
Maximize Z =20 x1 + 10 x2
--- Content provided by FirstRanker.com ---
Subject to, x1 + 2 x2 = 40
3x1 + x2 = 30
4x1 + 3x2 = 60
X1,X2 = 0 [07]
Q3
--- Content provided by FirstRanker.com ---
(a) What is standard time? Describe briefly how you will calculate “standard time” from the observed time obtained by time study? [03]
(b) Explain functions or elements of preventive maintenance. [04]
(c) Consider the project consist of following activities in weeks
Activity | 1-2 | 1-3 | 2-4 | 3-4 | 3-5 | 4-9 | 5-6 | 5-7 | 6-8 | 7-8 | 8-10 | 9-10
Duration | 4 | 1 | 1 | 1 | 6 | 5 | 4 | 8 | 1 | 2 | 5 | 7
--- Content provided by FirstRanker.com ---
Calculate the total project duration, critical path and total float [07]
OR
(a) Explain humidification and dehumidification. [03]
(b) Explain work measurement by algorithm. [04]
(c) Write a short note on Flow process chart [07]
--- Content provided by FirstRanker.com ---
Q4
(a) Draw two handed process chart for signing a letter and give summary for same. [03]
(b) Explain any one feed water treatment with neat sketch. [04]
(c) A company has 5 jobs to be done on five machines. Any job can be done on any machine. The cost of doing the jobs on different machines is given below. Assign the jobs for different machines so as to minimize the total cost. [07]
Date:14/12/2018
--- Content provided by FirstRanker.com ---
Total Marks: 70
Machines
Jobs | A | B | C | D | E
1 | 13 | 8 | 16 | 18 | 19
2 | 9 | 15 | 24 | 9 | 12
--- Content provided by FirstRanker.com ---
3 | 12 | 9 | 4 | 4 | 4
4 | 8 | 11 | 8 | 5 | 13
5 | 15 | 17 | 18 | 12 | 20
OR
Q.4 (a) Explain basic procedure for the method study. [03]
--- Content provided by FirstRanker.com ---
(b) Differentiate breakdown maintenance and preventive maintenance. [04]
(c) Obtain the initial basic feasible solution for the following transportation problem by north-west corner rule. Also find the optimality [07]
Origin/Destination | D1 | D2 | D3 | Supply
O1 | 2 | 7 | 4 | 5
O2 | 3 | 3 | 1 | 8
--- Content provided by FirstRanker.com ---
O3 | 5 | 4 | 7 | 7
O4 | 1 | 6 | 2 | 14
Demand | 7 | 9 | 18 | 34
Q.5
(a) Define three floats in CPM and PERT [03]
--- Content provided by FirstRanker.com ---
(b) Explain Cochran boiler with neat sketch [04]
(c) Consider the following project. Find the path and standard deviation. Also find probability of completing the project by 18 weeks. [07]
Activity | Optimistic time | Most likely time | Pessimistic time
A(1-2) | 3 | 6 | 9
B(1-3) | 2 | 5 | 8
--- Content provided by FirstRanker.com ---
C(2-4) | 2 | 4 | 6
D(3-4) | 2 | 3 | 10
E(3-5) | 1 | 3 | 11
F(4-6) | 4 | 6 | 8
G(5-6) | 1 | 5 | 15
--- Content provided by FirstRanker.com ---
OR
Q.5 (a) Define terms in PERT network: i) Optimistic time ii) Most likely time iii) expected time [03]
(b) Explain necessity of water treatment of boiler feed water [04]
(c) Explain PMTS and MTM in brief [07]