FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2018 Winter 7th Sem Old 170901 Inter Connected Power System Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 7th Sem Old 170901 Inter Connected Power System Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-VII (OLD) EXAMINATION — WINTER 2018

--- Content provided by‍ FirstRanker.com ---

Subject Code: 170901 Date: 03/12/2018
Subject Name: Inter Connected Power System
Time: 10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by‍ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

Q.1 (a) Explain the advantages and disadvantages of inter connected power system. 07
(b) Give the comparisons between NR-Method & G-S Method. 07

Q.2 (a) Explain the classification of bus. How slack bus is decided for Load flow study? 07

--- Content provided by​ FirstRanker.com ---

(b) Derive the equation for d coefficient. 07
OR
(b) Derive the static load flow equations. 07

Q.3 (a) Explain the Y-bus formation using singular transformation method. 07
(b) Explain Islanding and describe the importance during black-out. 07

--- Content provided by‍ FirstRanker.com ---

OR
Q.3 (a) Explain methods used for voltage control. 07
(b) Explain the speed governing system with neat diagram. 07

Q.4 (a) Explain clearly with a flow chart of computational procedure for load flow study by G-S Method. 07
(b) A two pole, 50 Hz, 11kV turbo generator has a rating of I00MW, power factor 0.85 lagging. The rotor has a moment of inertial of 10,000kg-m². Calculate H and M. 07

--- Content provided by‌ FirstRanker.com ---

OR
Q.4 (a) Discuss in brief the methods for improving transient stability 07
(b) Two generators rated 200 MW and 400 MW are operating in parallel. The droop characteristics of their governors are 4% and 5% respectively from no load to full load. The speed changers are so set that the generators operate at 50 Hz sharing the full load of 600 MW in the ratio of their ratings. If the load reduces to 400 MW how will it be shared among the generators and what will the systems frequency be? Assume free governor operation. 07

Q.5 (a) Explain tie-line load bias method of frequency control 07
(b) Prove that Md² d/dt> = Pm-Pe, Pm is mechanical power, Pe is electromagnetic power and M is angular momentum 07

--- Content provided by⁠ FirstRanker.com ---

OR
Q.5 (a) Discuss procedure for solving the swing equation using point by point method. 07
(b) Describe unit commitment in detail. 07