Download GTU BE/B.Tech 2018 Winter 7th Sem Old 172903 Production Planning And Maintenance Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 7th Sem Old 172903 Production Planning And Maintenance Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


FirstRanker.com

Subject Name: Production Planning & Maintenance

Time: 10:30 AM TO 01:00 PM

--- Content provided by‌ FirstRanker.com ---

Instructions:

  1. Attempt all questions.
  2. Make suitable assumptions wherever necessary.
  3. Figures to the right indicate full marks.

Q.1

--- Content provided by‍ FirstRanker.com ---

In a weaving unit 40 projectile looms are running with following quality of fabrics.

Fabric Details:

R.S.: 56” Reed count: 80s

Length contraction: 5% Warp/Weft: 2/80sNe / 50s Ne

Ends/dent: 2 GSM: 160

--- Content provided by‌ FirstRanker.com ---

Loom RPM: 320 Loom Effi.(%) : 89

Loom width: 130”

Calculate how many warp beams will be required per week for the above shed if maximum length of yarn on a beam is 3000 m (ignore selvedge during calculation) [09]

Calculate the time after which all cans will be exhausted on draw frame from following data. [05]

Doublings: 8 DF Speed: 450 mpm

--- Content provided by​ FirstRanker.com ---

DF Efficiency: 85% Count of sliver: 4.1 ktex

Wt. of sliver in one can: 27.8 Ibs Draft: 8

A fabric is to be produced having 40 inch Reed Space. The fabric has a weft way stripe of 50 threads per repeat comprising of 10 dark threads and 40 white threads. Find out requirement of dark and white weft yarn per 100 linear m of fabric. The PPI-are 60.Count of the weft yarn is 2/80s Ne. [07]

Calculate how many times warping creel needs to be changed from following data. [07]

Maximum length on warper’s beam : 20000 yds

--- Content provided by‍ FirstRanker.com ---

Length of yarn on weaver’s beam : 2000 yds

No. of ends'in weaver’s beam : 5328

No. of weaver’s beams required : 20

Count of yarn : 50s Ne

No. of threads in warping creel : 592

--- Content provided by‍ FirstRanker.com ---

Wt. of yarn on package : 1.75 kg

OR

A mill wants to produce 8000 m of a particular fabric every day. Calculate number of bobbins required from winding and pirn winding departments from following details. [07]

R.S.:45” EPI: 80 Weight of fabric: 175 gsm

Count : 40s / 34s Ne

--- Content provided by⁠ FirstRanker.com ---

Length of yarn on wound bobbin : 70000 m

Winding speed/eff. : 1100 mpm / 85%

Pirn winding speed/eff. : 500 ypm / 75%

Length contraction : 6%

Weight of yarn on pirn : 1.2 ozs

--- Content provided by‍ FirstRanker.com ---

FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER-VII (OLD) EXAMINATION - WINTER 2018

Subject Code: 172903 Date: 19/11/2018

Total Marks: 70

--- Content provided by‍ FirstRanker.com ---

Q.3

Loom no. Pick Counter Reading RPM PPI

Start End

1 10312 31696 98 90

2 09834 32514 210 80

--- Content provided by​ FirstRanker.com ---

3 18979 42739 220 52

Write all maintenance check points for winding and ordinary plain power loom. [07]

OR

Weaving department has following types of looms and the fabric varieties to be produced on particular loom. Calculate total requirement of yarn.(Assume 6 % contraction for each fabric) [10]

Loom details:

--- Content provided by FirstRanker.com ---

Type of loom Max. R.S. RPM Eff. % No. of looms

1. Air jet 190 cm 650 90 24

2. Rapier 220 cm 500 90 24

3. Autoloom 56” 200 90 48

Fabric Details & Requirement:

--- Content provided by‍ FirstRanker.com ---

No. EPI/PPI R.S” Wp/ Wt Req.(m) To be woven on

1 80/52 42 34/34 35000 Autoloom

2 120/ 96 56 2/80/50 30000 Air jet

3 80/ 80 50 2/60/2/60 28000 Rapier

Q4

--- Content provided by​ FirstRanker.com ---

Derive equation to work out length of yarn per weft bobbin, length of cloth produced per weft bobbin and no. of weft bobbins per loom per hour. [04]

What is the effect of change in PPI on number of weft bobbins required per hour? [04]

Write atleast five maintenance check points for carding machine [04]

An OE Spinning Plant has following requirement for a month (30 working days at 24 hrs per day) [10]

Count Requirement Rotor speed rpm eff.%

--- Content provided by‌ FirstRanker.com ---

9s 22,000 kgs 75000 95

Calculate no. of OE spindles required to produce above counts. Also calculate no. of cards required from following data.

Doffer dia:27” Doffer rpm: 35 Tension draft: 1.01

Count of sliver: 4.91 ktex Efficiency of Card : 85%

OR

--- Content provided by⁠ FirstRanker.com ---

A texturising plant has following requirement per day: [07]

Count(Denier) Required Production in kg

75/36 1200

75/36/400 0800

Calculate no. of spindles required of SDS 600(94%efficiency) and of TFO (running at 13000 rpm and 91 % efficiency).

--- Content provided by⁠ FirstRanker.com ---

There is a requirement of 300 kgs/day of 40s 100% cotton and 600 kgs/day of 54s PC blended (67:33)material. How many comber shifts required to cater requirement of material. Nips/min is 250 and feed/nip is 5 mm. Other data is as given below: [07]

Comber type Count lap wt.g/m noil % eff. %

Bicoiler 8 head 54s pc 68 15 90

FirstRanker.com

Q.5 (a) Ring frame department of a spinning unit supplies following yarns (from same mixing) to a weaving unit per day: [10]

--- Content provided by‌ FirstRanker.com ---

Count Fibres Production in kg

32sK 100 % 500

40s C Cotton 600

Work out number of blow room laps required per hour from following data.

Lap roller speed: 5 mpm efficiency : 85%

--- Content provided by⁠ FirstRanker.com ---

Count of lap : 490 g/m lap length : 40 yds

(assume waste% at all stages)

(b) Calculate the production of a ring frame from following data: [04]

Count : 42sNe

Spindles: 1008 Spindle speed/eff.% : 21000/85%

--- Content provided by‌ FirstRanker.com ---

OR

Q.5 (a) Calculate weight of doff, time after which doff is to be taken and time after which roving bobbin will be exhausted on ring frame from following data. [07]

Speed of RF: 15000 rpm Eff.: 87% Count of yarn: 42sNe

T™: 4.0 Wt. of roving bobbin: 3.5 lbs

Waste at RF: 2.5 % Count of roving: 0.59 ktex

--- Content provided by​ FirstRanker.com ---

No. of spindles: 880 Length of yarn on ring bobbin: 4200 m

(b) Calculate time after which the lap will be exhausted on card from following data. [07]

Lap weight: 490 ktex Lap length: 40 yd Doffer dia.: 277

Doffer rpm: 30 Efficiency: 86 % Tension draft: 1.01

Draft at card: 100

--- Content provided by​ FirstRanker.com ---