FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2018 Winter 8th Sem New 2180911 Power Quality And Management Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 8th Sem New 2180911 Power Quality And Management Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-VIII (NEW) EXAMINATION — WINTER 2018

--- Content provided by‌ FirstRanker.com ---

Subject Code: 2180911 Date: 15/11/2018
Subject Name: Power Quality And Management
Time: 02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by​ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks

MARKS

Q.1 (a) List the sources of harmonics in power system. 03

(b) What is Electromagnetic Interference (EMI)? Describe main sources of EMI 04

--- Content provided by FirstRanker.com ---

(c) Name and explain different types of power quality issues in brief. 07

Q.2 (a) List out the various instruments used for power quality measurement. 03

(b) Define flicker. List reasons responsible for flicker. 04

(c) Explain EMI mitigation methods in detail. 07

OR

--- Content provided by FirstRanker.com ---

(c) Explain effect of harmonics on (1) transformers and (2) capacitor banks. 07

Q.3 (a) Discuss the sources of voltage sag. 03

(b) Write short note on voltage regulators. 04

(c) Explain the responsibilities of the suppliers and users of electrical power. 07

OR

--- Content provided by​ FirstRanker.com ---

Q.3 (a) Differentiate grounding and bonding: 03

(b) Explain power quality issues with a system containing DG. 04

(c) List and explain different power quality issues affected by DG. 07

Q.4 (a) Explain active and reactive power factor in brief. 03

(b) Define displacement power factor and true power factor and list out the different methods for power factor improvement. 04

--- Content provided by FirstRanker.com ---

(c) Explain application of synchronous condensers for power factor improvement. 07

OR

Q.4 (a) Write a note on harmonic analyzer. 03

(b) Discuss the Capacitor switching transient. 04

(c) Mention the types and causes of transients and explain any two in brief. 07

--- Content provided by‍ FirstRanker.com ---

Q.5 (a) State the essential elements of a grounding system. 03

(b) Write short note on importance and application of True RMS meter. 04

(c) Explain application of Ferro resonance transformer. 07

OR

Q.5 (a) Define the following terms. (1) Inrush current (2) Bonding (3) Form factor. 03

--- Content provided by‍ FirstRanker.com ---

(c) Explain the main steps to monitor the power quality problems at site. 07

FirstRanker.com



--- Content provided by FirstRanker.com ---

This download link is referred from the post: GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University