GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-VIII (NEW) EXAMINATION — WINTER 2018
--- Content provided by FirstRanker.com ---
Subject Code: 2181704 Date: 26/11/2018
Subject Name: Project Engineering and Management
Time: 02:30 PM TO 05:00 PM Total Marks: 70
Instructions:
- Attempt all questions.
- Make suitable assumptions wherever necessary.
- Figures to the right indicate full marks.
--- Content provided by FirstRanker.com ---
MARKS
Q.1 (a) Define the term “project” and its purpose in Engineering. 03
(b) Define Degree of automation in Project management. 04
--- Content provided by FirstRanker.com ---
(c) Discuss Basic and detailed engineering Project Management. 07Q.2 (a) Define life-cycle phases of project planning 03
(b) Explain term: 04
1. Project breakdown structure and planning cycle.
2. Project specification.
--- Content provided by FirstRanker.com ---
3. Bar charts related to project management.(c) Define Project S curve. Discuss CPM & PERT Methods. 07
OR
(c) Explain EPC and BOOT types of projects in detail. 07
Q.3 (a) Define term Project Reviews. 03
--- Content provided by FirstRanker.com ---
(b) Explain Projects specifications 04(c) Explain project controlling and project planning, scheduling in details. 07
OR
Q.3 (a) Enlist various types of project management function. 03
(b) Explain Cost breakdown structures and planning cycle. 04
--- Content provided by FirstRanker.com ---
(c) Discuss advantages of Project management. 07Q.4 (a) List methods used for flow and pressure measurement. 03
(b) Explain temp. Transmitter loop checking process 04
(c) Explain any one level measurement method in detail. 07
OR
--- Content provided by FirstRanker.com ---
Q.4 (a) Enlist control valve based on their function. 03(b) Explain control valve coefficient. 04
(c) Discuss control valve noise problem in detail. 07
Q.5 (a) Define 4 to 20 mA standard. 03
(b) Compare single seat, multi seat, split rang, valve range ability related to control valve 04
--- Content provided by FirstRanker.com ---
(c) Discuss ISO 9000 test standard and calibration. 07OR
Q.5 (a) Define: (1) valve flow capacity Cv (2) rangeability (3) cavitation. 03
(b) Discuss control valve flow characteristics. 04
(c) What is Loop check? Write check-out procedure for filled system temperature transmitter 07
--- Content provided by FirstRanker.com ---
This download link is referred from the post: GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University
--- Content provided by FirstRanker.com ---