GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-VIII (OLD) EXAMINATION — WINTER 2018
Subject Code: 180906 Date: 29/11/2018
Subject Name: Advanced Power System -II
Time: 02:30 PM TO 05:00 PM Total Marks: 70
--- Content provided by FirstRanker.com ---
Instructions:
- Attempt all questions.
- Make suitable assumptions wherever necessary.
- Figures to the right indicate full marks.
Q.1 (a) What is voltage stability? Explain different types of voltage stability. 07
--- Content provided by FirstRanker.com ---
(b) Draw static security level diagram presented by stott et al. 07
Q.2 (a) Draw a schematic diagram showing the information flow between the various function to be performed in an operations control center computer system. 07
(b) Explain least square approximation method for state estimation. 07
OR
(b) Write a short note on treatment of bad data and its detection. 07
--- Content provided by FirstRanker.com ---
Q.3 (a) Draw a complete flowchart for contingency analysis. 07
(b) Prove that the receiving end voltage is extremely sensitive to any change in Power status at the receiving end bus. 07
OR
Q.3 (a) Define and explain sensitivity factors. 07
(b) With the help of analytical concept of voltage stability for a two bus system, define critical receiving end voltage for an uncompensated lossless line transmission system operating at unity power factor. 07
--- Content provided by FirstRanker.com ---
Q.4 (a) What is the role of load forecasting? How it reflects in current and future trends? 07
(b) Explain the characteristics of (i) the receiving end voltage of a basic power transmission system for varying system reactance and, (ii) the characteristic of voltage V/s system short circuit capacity for any fixed value of real power flow Considering leading, u.p.f. and lagging power factors load. 07
OR
Q.4 (a) Explain auto regressive model for stochastic time series approach. 07
(b) Explain the operation of synchronous condenser in steady state using V-I characteristics. Provide its application. 07
--- Content provided by FirstRanker.com ---
Q.5 (a) Explain structure of vertically integrated utility. 07
(b) What are the problems occurring in restoration after blackout. 07
OR
Q.5 (a) Explain structure and entities in deregulated industries. 07
(b) Explain the V-P characteristics of static impedance load and dynamic impedance load for different tap position. 07