Download PTU B.Tech 2020 March IE 6th Sem Lean Management Question Paper

Download PTU (I.K. Gujral Punjab Technical University Jalandhar (IKGPTU) ) BE/BTech IE (Industrial Engineering and Management) 2020 March 6th Sem Lean Management Previous Question Paper

This post was last modified on 21 March 2020

PTU B.Tech Question Papers 2020 March (All Branches)


FirstRanker.com
Firstranker's choice
FirstRanker.com

--- Content provided by‍ FirstRanker.com ---


Roll No. [T T TT] Total No. of Pages : 02
Total No. of Questions : 09
B.Tech. (Ind. Engg. & Mgt.) (Spl. in TQM) PT (Sem.-6)
LEAN MANAGEMENT

--- Content provided by‌ FirstRanker.com ---

Subject Code : IEM-602
M.Code : 70998


Time : 3 Hrs. Max. Marks : 40
INSTRUCTIONS TO CANDIDATES :

--- Content provided by​ FirstRanker.com ---

  1. Attempt All EIGHT questions from SECTION-A carrying TWO marks each.
  2. Attempt any SIX questions out of EIGHT from SECTION-B carrying FOUR marks each.

SECTION-A

  1. Answer briefly :
    1. What is Jidoka? Explain the principles of Jidoka to ensure that a company would deliver defect-free products.
    2. Explain and differentiate between 3M’s of waste elimination.
    3. --- Content provided by⁠ FirstRanker.com ---

    4. What do manufacturing firms need to implement 5S at workplace? Enumerate the keys to successful 5S implementation.
    5. Define talk time. How do firms evaluate talk time? Explain benefits and limitations of talk time.
    6. Define value stream mapping. Discuss five steps to value stream mapping study in an organization.
    7. How does TPS lead to cycle time reduction at workplace in manufacturing organizations?
    8. Define Overall Equipment Effectiveness. How OEE can be calculated? What indications regarding manufacturing system efficiency does OEE provide?
    9. --- Content provided by FirstRanker.com ---

    10. How do organizations make technology fit with people and lean processes?

FirstRanker.com

FirstRanker.com
Firstranker's choice

--- Content provided by FirstRanker.com ---

FirstRanker.com

SECTION-B

  1. Explain the terminology used in Toyota production system. Giving a neat sketch of TPS house, explain various elements of TPS.
  2. Explain the causes of seven wastes associated with manufacturing systems.
  3. How do organizations implement visual management at workplace? Explain the use of indicator, signal, control and takt boards for improving manufacturing system management.
  4. --- Content provided by​ FirstRanker.com ---

  5. Explain the characteristic features, advantages, limitations and applications of continuous flow and batch production systems.
  6. Discuss the working, and advantages of various types of work cell layouts used in manufacturing organizations.
  7. Explain PDCA approach for mitigation of defects at workplace.
  8. Describe the TPM implementation procedure adopted by manufacturing organizations.
  9. How do organizations evolve roles of top and middle managements to achieve quality under TPS?
  10. --- Content provided by‌ FirstRanker.com ---

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.



This download link is referred from the post: PTU B.Tech Question Papers 2020 March (All Branches)

--- Content provided by FirstRanker.com ---