FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU B.Tech 2021 Jan CSE 7th Sem 71899 Software Project Management Question Paper

Download PTU (Punjab Technical University) B.Tech (Bachelor of Technology) / BE (Bachelor of Engineering) 2021 January CSE 7th Sem 71899 Software Project Management Previous Question Paper

This post was last modified on 26 June 2021

PTU B.Tech 2021 January Previous Question Papers || PTU Punjab Technical University


FirstRanker.com

FirstRanker.com

Roll No. Total No. of Pages : 02

--- Content provided by FirstRanker.com ---

Total No. of Questions: 18

B.Tech. (CSE) (2012 to 2017 E-II) (Sem.-7)

SOFTWARE PROJECT MANAGEMENT

Subject Code: BTCS-907

M.Code: 71899

--- Content provided by‌ FirstRanker.com ---

Time: 3 Hrs. Max. Marks : 60

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
  4. --- Content provided by‌ FirstRanker.com ---

SECTION-A

Write briefly :

  1. Contract Management
  2. Risk Management
  3. Test Automation
  4. --- Content provided by‍ FirstRanker.com ---

  5. Cash flow forecasting
  6. Change control
  7. Visualizing Process
  8. Earned Value
  9. Hazard Analysis
  10. --- Content provided by⁠ FirstRanker.com ---

  11. CMMI
  12. Project Scheduling

SECTION-B

  1. What is cost estimation? What are different factors that affect the cost?
  2. Explain Oldman-Hackman job characteristic model. Elaborate with example.
  3. --- Content provided by​ FirstRanker.com ---

  4. Explain Contract Management in detail. Also give details about its types.
  5. How Risk Management is important in software project management? Explain its nature and types.
  6. What is the role of organization and team structures in quality assurance of software? Explain.

SECTION-C

  1. What are various parameters in Earned Value Analysis? How it helps in monitoring and control of any software project?
  2. --- Content provided by‍ FirstRanker.com ---

  3. a) What are the various activities involved in software project management? Explain.
    b) Discuss in detail about team structure.
  4. How Software Configuration Management helps in Change management? What are the various processes of Software configuration management?

NOTE: Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.

FirstRanker.com

--- Content provided by‌ FirstRanker.com ---



This download link is referred from the post: PTU B.Tech 2021 January Previous Question Papers || PTU Punjab Technical University

--- Content provided by FirstRanker.com ---