FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU B.Tech 2021 Jan CSE 7th Sem 71899 Software Project Management Question Paper

Download PTU (Punjab Technical University) B.Tech (Bachelor of Technology) / BE (Bachelor of Engineering) 2021 January CSE 7th Sem 71899 Software Project Management Previous Question Paper

This post was last modified on 26 June 2021

This download link is referred from the post: PTU B.Tech 7th Semester Last 10 Years Previous Question Papers|| Punjab Technical University 2011-2021


Firstranker's choice FirstRanker.com


Roll No. Total No. of Questions : 18
Total No. of Pages : 02

B.Tech. (CSE) (2012 to 2017 E-II) (Sem.-7)
SOFTWARE PROJECT MANAGEMENT

--- Content provided by FirstRanker.com ---

Subject Code : BTCS-907
M.Code: 71899
Time: 3 Hrs. Max. Marks : 60

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. --- Content provided by FirstRanker.com ---

  3. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  4. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.

SECTION-A

Write briefly :

  1. Contract Management
  2. --- Content provided by FirstRanker.com ---

  3. Risk Management
  4. Test Automation
  5. Cash flow forecasting
  6. Change control
  7. Visualizing Process
  8. --- Content provided by FirstRanker.com ---

  9. Earned Value
  10. Hazard Analysis
  11. CMMI
  12. Project Scheduling

Firstranker's choice FirstRanker.com

--- Content provided by FirstRanker.com ---

SECTION-B

  1. What is cost estimation? What are different factors that affect the cost?
  2. Explain Oldman-Hackman job characteristic model. Elaborate with example.
  3. Explain Contract Management in detail. Also give details about its types.
  4. How Risk Management is important in software project management? Explain its nature and types.
  5. --- Content provided by FirstRanker.com ---

  6. What is the role of organization and team structures in quality assurance of software? Explain.

SECTION-C

  1. What are various parameters in Earned Value Analysis? How it helps in monitoring and control of any software project?
  2. a) What are the various activities involved in software project management? Explain.
    b) Discuss in detail about team structure.
  3. --- Content provided by FirstRanker.com ---

  4. How Software Configuration Management helps in Change management? What are the various processes of Software management?

NOTE: Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.



--- Content provided by FirstRanker.com ---

This download link is referred from the post: PTU B.Tech 7th Semester Last 10 Years Previous Question Papers|| Punjab Technical University 2011-2021