FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTUA MBA 2nd Sem Supple 2015 Dec 9E00204 Production And Operations Management Question Paper

Download JNTUA (JNTU Anantapur) MBA (Master of Business Administration) 2nd Sem Supple 2015 Dec 9E00204 Production And Operations Management Previous Question Paper

This post was last modified on 27 July 2020

JNTU Anantapur MBA 3rd Sem last 10 year question papers 2010 -2020 -All regulation- 2nd Year 1st Sem


Firstranker's choice

FirstRanker.com

MBA & MBA (Finance) II Semester Supplementary Examinations December/January 2015/2016

--- Content provided by‌ FirstRanker.com ---

PRODUCTION & OPERATIONS MANAGEMENT

(For students admitted in 2011, 2012, 2013 & 2014)

Time: 3 hours Max. Marks: 60

Answer any FIVE questions

All questions carry equal marks

*****

--- Content provided by‍ FirstRanker.com ---

  1. (a) Define production and operations management and discuss different types of production systems with suitable examples.
    (b) Briefly discuss functions of production and operations management.
  2. Illustrate the product design process with a suitable example.
  3. There are five existing facilities which are to be served by a single new facility. The details of the existing facilities are shown in the following table.
    Existing facility 1 2 3 4 5
    Coordinates (ai, bi) 5,10 20,5 15,20 30,25 25,5
    No. of trips of loads/year 100 300 200 300 100

    --- Content provided by​ FirstRanker.com ---

    Find the optimum location of the new facility based on CO gravity location concept.
  4. Briefly explain different long term and short term strategies.
  5. (a) What is job scheduling problem? Distinguish it from flow shop scheduling problem with a suitable example.
    (b) Explain the active schedule, semi-active schedule and non-delay schedule.
  6. (a) Distinguish between method study and time study.

    --- Content provided by⁠ FirstRanker.com ---

    (b) Briefly discuss different steps in work sampling.
  7. (a) Discuss various ways of improving productivity.
    (b) Discuss the concepts of productivity cycle, productivity engineering and management.
  8. The following table gives the number of missing rivets noted in a newly fabricated bus. Construct a C-chart.
    Bus No. 1 2 3 4 5 6 7 8 9 10
    No. of missing rivets 14 13 26 20 9 25 15 11 14 13