Download BU (Bangalore University) MBA 2nd Semester 2016 July Quantitative Techniques Operational Research Question Paper

Download BU (Bangalore University) MBA (Master of Business Administration) 2nd Semester 2016 July Quantitative Techniques Operational Research Question Paper

This post was last modified on 28 January 2020

BU MBA Last 10 Years 2010-2020 Previous Question Papers || Bangalore University (1st, 2nd, 3rd & 4th Sem)


PG-923

II Semester M.B.A. Degree Examination, July 2016

(CBCS)

--- Content provided by‍ FirstRanker.com ---

MANAGEMENT

2.6: Quantitative Techniques and Operation Research

Time: 3 Hours

Max. Marks: 70

SECTION-A

--- Content provided by​ FirstRanker.com ---

Answer any five of the following. Each question carries five marks. (5x5=25)

  1. Distinguish between Analytical and Simulation Models.
  2. A firm is considering replacement of a machine whose cost price is Rs. 12,200 and the scrap value is Rs. 200. The maintenance costs are found from experience to be as follows:
    Year 1 2 3 4 5 6 7 8
    Maintenance Cost (Rs.) 200 500 800 1200 1800 2500 3200 4000
    What is the optimal replacement interval for this machine?
  3. Five jobs are to be processed and five machines are available. Any machine can process any job with resulting. Profit (in Rs.) as follows. Find assignment pattern that maximizes the sales.

    --- Content provided by⁠ FirstRanker.com ---

    A B C D E
    1 70 75 71 60 80
    2 55 57 64 61 50
    3 60 54 80 71 55
    4 80 72 75 65 70
    5 50 56 70 51 72
    Jobs
    Machines
  4. Explain the essential features of queuing system.
  5. What is degeneracy? How it can be resolved in case of Transportation?
  6. Find out the sequence that minimizes the total elapsed time required in performing the following tasks on machine M1 and M2 in the order M1, M2. Also, find the minimum total elapsed time.

    --- Content provided by‌ FirstRanker.com ---

    Task A B C D E F G H
    M1 5 4 9 6 8 7 5 4
    M2 6 8 7 4 3 9 8 11
  7. Moon Light Bakery keeps stock of a popular brand of cake. Previous experience indicates the daily demand as given here.
    Daily Demand 0 10 20 30 40 50
    Probability .01 .20 .15 .50 .12 .02
    Consider the following sequence of random numbers.
    R. No. 48, 78, 19, 51, 56, 77, 15, 14, 68, 09.
    Simulate the demand for next 10 days. Find out the stock situation if the owner of the bakery decides to make 30 cakes every day. Also estimate the daily average demand for the cakes on the basis of simulated data.
  8. --- Content provided by​ FirstRanker.com ---

SECTION-B

Answer any three of the following questions each question carries ten marks. (10x3=30)

  1. National Oil Co. has three refineries and 4 depots. Transaction costs per barrel and requirements are given below. Determine optimal allocation of output.
    D1 D2 D3 D4 Capacity
    R1 5 7 13 10 700
    R2 8 6 14 13 400
    R3 12 10 9 11 800
    Requirement 300 600 700 400
  2. "Operation Research is the application of Scientific Methods, techniques and tools to problems involving in the operations of a system so as to provide those in control of the systems with optimum solution to the problems." Discuss with suitable examples.
  3. --- Content provided by⁠ FirstRanker.com ---

  4. Determine the dominance principle of game theory using the following:
    B1 B2 B3 B4
    A1 15 35 25 5
    A2 10 20 5 0
    A3 20 50 10 5
    A4 25 55 15 20
    Firm B
    Firm A
  5. A project consists of eight activities with the following relevant information:
    Activities Immediate Predecessor Optimistic Most Likely Pessimistic
    A --- 1 1 7
    B --- 1 4 7
    C A 2 2 8
    D B 1 1 1
    E B 2 5 14
    F C 2 5 8
    G D,E 3 6 15
    H F,G 1 2 3
    Estimated Duration (Days)
    1. Draw the PERT network and determine critical path.
    2. --- Content provided by‌ FirstRanker.com ---

    3. If a 30 days deadline is imposed, what is the probability that the project will be finished within the time?
    4. If the project manager wants to be 99% sure that the project is completed on the scheduled date, how many Weeks before that date should he start the project work?

SECTION-C

12. Case Study (Compulsory): (1x15=15)

--- Content provided by‌ FirstRanker.com ---

A company manufactures three types of parts which use precious metals platinum and gold. Due to shortage of these precious metals, the govt. regulates the amount that may be used per day. The relevant data with respect to supply requirements and profit are summarized in the table shown below:

Product Platinum Per Unit (gm) Gold Required Per Unit (gm) Profit Per Unit (Rs.)
A 2 3 500
B 4 2 600
C 6 4 1200

Daily allotment of platinum and gold are 160 gm and 120 gm respectively. Determine the optimum profit under Simplex Method.