Download AKTU B-Tech 8th Sem 2015-16 EME 064 Production And Operations Management Question Paper

Download AKTU (Dr. A.P.J. Abdul Kalam Technical University (AKTU), formerly Uttar Pradesh Technical University (UPTU) B-Tech 8th Semester (Eight Semester) 2015-16 EME 064 Production And Operations Management Question Paper

Printed Pages: 6 EME?064
(Following Paper ID and Roll No. to be ?lled in your
Answer Books)
Roll No
B. TECH.
Theory Examination (Semester?VIII) 2015-16
PRODUCTION AND OPERATIONS MANAGEMENT
Time : 3 Hours, Max. Marks : 100
Section-A
1. Attempt all parts. All parts carry equal marks. Write
answer of each part in short. (2X10=20)
(3) Explain the concept of ?ve P?s.
(b) What do you understand by operations strategy?
(c) What is the role of standardization in product
design?
((1) Discuss the concept of service capacity.
(e) Explain earliest start and ?nish times.
(0 What are free ?oat and independent ?oat?
? (1) P.T.O.
106/4971/261/6525 ?

(g)
_ (h)
(i)
(i)
(a)
(b)
(C)
(d)
De?ne MRP and MRP 11.
Brie?y discuss master schedule.
Di??erentiate between normal time and standard time.
List various thetblings.
Section-B
Attempt any ?ve questions from this section.
(10XS=50)
What do you understand by product design? Discuss
various steps involved in product design process.
What are di??erent strategies for service capacity
planning? Also discuss various approaches for
designing service processes.
What do you mean by facility location? What are
different factors involved in facility location plan-
ning? ?
What is facility layout? Discuss di??erent types 0
facility layouts. ?
(2)
106/494/261/6525
(e) What do you understand by aggregate plamn'ng? Explain
all the steps involved in effective aggregate planning.
(t) .What is work design? What are various components of
work design process? Explain.
(g) Discuss an the inputs and outputs in MRP system.
(b) What do you understand by operations management?
Also discuss its scope.
Section-C
Note : Attempt any two questions from this section.
(15x2=3o)
3. (a) A limited company is planning to start a new factory for
manufacturing steel utensils. It is considering three lom-
tions, namely, Bokaro, Jamshedpur and Bhilai. The ?xed
costs at the three locations have been estimated at Rs.
8.15 million, Rs 7.377 million and Rs 7.903 million ne-
spectively. The variable costs at the three locations are
estimated at Rs 500 per unit, Rs 580 per unit and Rs
490 per unit respectively. The factory will have an an-
nual production capacity of 10,000 steel utensils and in
(3) P.T.O.
106/394/261/6525

the initial years, it Will operate at 75% efficiency. : (iv) Calculate the probability that the project will
Find the best location option, which has the lowest be completed at least 3 weeks than expected. .
, total cost of production. . (5) I
- (v) Ifthe project due date is 18 weeks, what is the
(b) A small project is cbmposed of 7 activities whose 1 probability of not meeting the due date?
time mtix?nates are listed belOw. Activities are being ,
identi?ed by their beginning (i) and ending 0) node 4. (a) What do you understand by good quality? What is
numbers: (10) Deming?s contribution to management of quality? (5)
Activities ? Ttme in Weeks (b) A machine operator has to perform three operations,
_ ' . namely plane turning, step turmng and taper tummg on a
l J. t? t' t" 1 number of different jobs. The relevant data is tabulated
1 2 1 1 7 ' t as :
1 3 1 4 7
1 4 _ 2 2- 8 ? job Time forplane Time forstep Tune fortaper
2 5 1 . l 1 turning taming turning
3 5 . 2 5 14 . (in m) ?5" mi?) (in mi?)
4 6 2 5 8 ,1 3_ 8 13
5 6 3 6 15 2 12 ' 6 14
_ , ; 3 5 4
Now : (i) Draw the network. .? 9
, - _ 4} 2 6 12
(ii) CaICulate the expected variances. 5 9 3 8
. ,1 v ,.. V . . 6 11 l 13
(111) Fmd the expected project completlon tlme.
Obtain optima] sequence of jobs as well as total elapsed
time, and idle time for the three operations. (10)
. 1 . (4) (5) P.T.O.
106/494/261/6525 106/494/261/6525

5. (a) What are symptoms of a bad layout ? (5)
(b) What do you understand by principles of motion
economy? Discuss. (5)
(c) Wlm are di??emnt activities involved in operations sched-
uling prams? . (5)