FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU BMCI 2020 March 6th Sem 74316 Project Management Question Paper

Download PTU (I.K. Gujral Punjab Technical University Jalandhar (IKGPTU) BMCI 2020 March (Bachelor in Mobile Computing & Internet) 6th Sem 74316 Project Management Previous Question Paper

This post was last modified on 31 March 2020

PTU BMCI 2020 March Previous Question Papers


FirstRanker.com

Roll No. ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ ‘ Total No. of Pages : 02

Total No. of Questions : 09

--- Content provided by‍ FirstRanker.com ---

BMCI (2014 & Onwards) (Sem.-6)

PROJECT MANAGEMENT

Subject Code : BMCI-602

M.Code : 74316

Time : 3 Hrs. Max. Marks : 60

--- Content provided by FirstRanker.com ---

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.

SECTION-A

--- Content provided by‌ FirstRanker.com ---

  1. Write briefly :
    1. Project Management
    2. Control systems
    3. Social cost benefit analysis
    4. Risk management
    5. Project life cycle
    6. --- Content provided by FirstRanker.com ---

    7. Risk & Uncertainty
    8. Debentures
    9. Payback period
    10. Internal rate of return
    11. Project types.
    12. --- Content provided by FirstRanker.com ---

FirstRanker.com

SECTION-B

  1. What are the various roles of a successful Project Manager?
  2. How can one check the economic and financial feasibility of a project? Elaborate.
  3. --- Content provided by⁠ FirstRanker.com ---

  4. Discuss the concept of Managing Stakeholder Expectations.
  5. Elaborate the concept of Planning and resourcing a project.
  6. What are control systems? What are the main control constraints and how are these managed.

SECTION-C

  1. What are the differences between Project Monitoring and Controlling? Also give examples.
  2. --- Content provided by‌ FirstRanker.com ---

  3. Explain briefly the various approaches to Social cost benefit analysis.
  4. “A Project manager should not have other managerial responsibilities”. Discuss.

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.

FirstRanker.com


--- Content provided by​ FirstRanker.com ---


This download link is referred from the post: PTU BMCI 2020 March Previous Question Papers