FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download VTU BE 2020 Jan ME Question Paper 15 Scheme 7th Sem 415ME71 Energy Engineering

Download Visvesvaraya Technological University (VTU) BE ( Bachelor of Engineering) ME (Mechanical Engineering) 2015 Scheme 2020 January Previous Question Paper 7th Sem 415ME71 Energy Engineering

This post was last modified on 02 March 2020

--- Content provided by⁠ FirstRanker.com ---

Note: Answer any FIVE full questions, choosing ONE full question from each module.
Module-1
1 a. Enumerate and explain the steps involved in handling of the coal. (08 Marks)
h. Explain the traveling grate stoker, with a neat sketch. (08 Marks)
OR

--- Content provided by FirstRanker.com ---

2 a. What are the different types of cooling ponds and cooling towers? (06 Marks)
b. Define Draught and explain forced draught, with a neat sketch. (06 Marks)
c. Explain the function of air ? preheater and superheater in thermal power plant. (04 Marks)
Module-2
3 a. Draw the layout of a diesel power plant. (06 Marks)

--- Content provided by​ FirstRanker.com ---

b. Show the different methods of engine cooling. (04 Marks)
c. Explain different methods of starting the diesel engine. (06 Marks)
OR
4 a. Classify hydro ? electric plants. (02 Marks)
h. Explain the necessity of using the components like surge tank, gates and valves in hydel

--- Content provided by‌ FirstRanker.com ---

power station. (06 Marks)
c. At a particular site the mean discharge (in millions of m
3
) of a river in 12 months from
January to December are 30, 25, 20, 0, 10, 50, 80, 100, 110, 65, 45 and 30 respectively.

--- Content provided by‌ FirstRanker.com ---

Draw the flow duration curve on graph sheet. Also estimate the power developed in MW if
the available head is 90m and the overall efficiency of generation is 87.4%. Assume each
month of 30 days. (08 Marks)
Module-3
5 a. What is Pyrheliometer? With a neat sketch, explain its working principle. (07 Marks)

--- Content provided by‍ FirstRanker.com ---

b. Explain the following : i) Solar constant ii) Extra terrestrial radiation
iii) Global radiation. (03 Marks)
c. With a neat sketch, explain the working of space heating and cooling by using solar
collectors. (06 Marks)
OR

--- Content provided by‌ FirstRanker.com ---

6 a. Explain with neat figure working of a solar photovoltaic cell. (08 Marks)
b. Explain the applications of solar photovoltaic cells. (08 Marks)
Module-4
7 a. What are the major problems associated with wind power? Explain horizontal axis wind mill
with sketch. (08 Marks)

--- Content provided by‍ FirstRanker.com ---

1 of 2
FirstRanker.com - FirstRanker's Choice
USN
415ME71
Sev enth Semester B.E. Degree Examination, Dec.2019/Jan.2020

--- Content provided by‌ FirstRanker.com ---

Energy Engineering
Time: 3 hrs. Max. Marks: 80
Note: Answer any FIVE full questions, choosing ONE full question from each module.
Module-1
1 a. Enumerate and explain the steps involved in handling of the coal. (08 Marks)

--- Content provided by⁠ FirstRanker.com ---

h. Explain the traveling grate stoker, with a neat sketch. (08 Marks)
OR
2 a. What are the different types of cooling ponds and cooling towers? (06 Marks)
b. Define Draught and explain forced draught, with a neat sketch. (06 Marks)
c. Explain the function of air ? preheater and superheater in thermal power plant. (04 Marks)

--- Content provided by⁠ FirstRanker.com ---

Module-2
3 a. Draw the layout of a diesel power plant. (06 Marks)
b. Show the different methods of engine cooling. (04 Marks)
c. Explain different methods of starting the diesel engine. (06 Marks)
OR

--- Content provided by​ FirstRanker.com ---

4 a. Classify hydro ? electric plants. (02 Marks)
h. Explain the necessity of using the components like surge tank, gates and valves in hydel
power station. (06 Marks)
c. At a particular site the mean discharge (in millions of m
3

--- Content provided by⁠ FirstRanker.com ---

) of a river in 12 months from
January to December are 30, 25, 20, 0, 10, 50, 80, 100, 110, 65, 45 and 30 respectively.
Draw the flow duration curve on graph sheet. Also estimate the power developed in MW if
the available head is 90m and the overall efficiency of generation is 87.4%. Assume each
month of 30 days. (08 Marks)

--- Content provided by⁠ FirstRanker.com ---

Module-3
5 a. What is Pyrheliometer? With a neat sketch, explain its working principle. (07 Marks)
b. Explain the following : i) Solar constant ii) Extra terrestrial radiation
iii) Global radiation. (03 Marks)
c. With a neat sketch, explain the working of space heating and cooling by using solar

--- Content provided by‌ FirstRanker.com ---

collectors. (06 Marks)
OR
6 a. Explain with neat figure working of a solar photovoltaic cell. (08 Marks)
b. Explain the applications of solar photovoltaic cells. (08 Marks)
Module-4

--- Content provided by‌ FirstRanker.com ---

7 a. What are the major problems associated with wind power? Explain horizontal axis wind mill
with sketch. (08 Marks)
1 of 2
15ME71 ?
b. A horizontal shaft, propeller type wind turbine is located in area having the following wind

--- Content provided by‍ FirstRanker.com ---

characteristics :
Speed of wind 10m/s at 1 atm and 15
?
C. Calculate the following :
i) Total power density in wind stream, W/m

--- Content provided by⁠ FirstRanker.com ---

2
.
ii) Maximum possible obtainable power density in W/m
2
.

--- Content provided by⁠ FirstRanker.com ---

iii) Actual obtainable power density in W/m
2
assuming 40% efficiency.
iv) Total power from the wind turbine of 120m diameter. (08 Marks)
(08 Marks)

--- Content provided by‌ FirstRanker.com ---

(08 Marks)
(08 Marks)
(08 Marks)
OR
8 a. Describe the principle of power generation methods using tidal energy source.

--- Content provided by⁠ FirstRanker.com ---

b. What are the advantages and limitations of Tidal power generation?
Module-5
9 a. Explain Photosynthesis with example.
b. Explain briefly method of biomass gasification.
OR

--- Content provided by FirstRanker.com ---

10 a. Mention the different types of fuel cells.
b. Explain a simple MHD generator and its working with figure.
c. With a sketch, explain the working of "Hot dry rock" geothermal plant.
(02 Marks)
(08 Marks)