FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

PTU B.Tech Electrical Engineering 6th Semester May 2019 71154 INSTRUMENTATION IN POWER SYSTEM Question Papers

PTU Punjab Technical University B-Tech May 2019 Question Papers 6th Semester Electrical and Electronics Engineering (EEE)-EE-Electrical Engineering

This post was last modified on 04 November 2019

PTU B.Tech 6th Semester Last 10 Years 2009-2019 Previous Question Papers|| Punjab Technical University


Firstranker's choice

FirstRanker.com


--- Content provided by​ FirstRanker.com ---

Roll No.

Total No. of Questions : 09

Total No. of Pages : 02

B.Tech.(EE/Electrical & Electronics) (2011 Onwards E-I)

(Sem.-6)

--- Content provided by FirstRanker.com ---

INSTRUMENTATION IN POWER SYSTEM

Subject Code : BTEE-605C

M.Code : 71154

Time : 3 Hrs. Max. Marks : 60

INSTRUCTION TO CANDIDATES :

--- Content provided by‍ FirstRanker.com ---

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.

SECTION-A

  1. Answer briefly :
    1. Define accuracy and precision.
    2. --- Content provided by‍ FirstRanker.com ---

    3. What is linearity of a transducer?
    4. What are the application of SCADA system?
    5. What do you mean by the term 'shielding'?
    6. What is the function of sample and hold circuit?
    7. What are the properties of modulated signals?
    8. --- Content provided by⁠ FirstRanker.com ---

    9. What is meant by Total Harmonic distortion?
    10. Differentiate between electrical and mechanical transducers.
    11. What is the purpose of “multiplexer” in a telemetry system?
    12. What are the components of SCADA?
  2. --- Content provided by⁠ FirstRanker.com ---

SECTION-B

  1. Explain SCADA architecture in detail. State advantages and disadvantages of SCADA systems.
  2. What are the different types of telemetering system? Explain the land-line telemetering system and describe its advantages.
  3. What is the role of instrumentation in hydro power plant? Explain detail with proper diagram.
  4. What is a power factor? Explain the method of measurement of power factor. Also, explain the active and reactive powers in a plant.
  5. --- Content provided by FirstRanker.com ---

  6. Explain the circuit of multimeter for measurement of a.c. voltages.

SECTION-C

  1. Explain the working principle of single phase induction type energy meter. Also discuss various methods of frequency and phase angle measurements with neat diagrams.
  2. Explain the working of capacitive type potential transformer with their transient behaviour.
  3. Explain the effect of following on Current transformers
    1. Change of primary winding current
    2. --- Content provided by FirstRanker.com ---

    3. Change of secondary circuit burden
    4. Change of frequency

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.


--- Content provided by‍ FirstRanker.com ---


This download link is referred from the post: PTU B.Tech 6th Semester Last 10 Years 2009-2019 Previous Question Papers|| Punjab Technical University