FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU B.Arch 2020 Dec 6th Sem 72292 Estimating, Costing And Specifications I Question Paper

Download PTU (I.K.Gujral Punjab Technical University (IKGPTU)) Bachelor of Architecture (B. Arch.) 2020 December 6th Sem 72292 Estimating, Costing And Specifications I Previous Question Paper

This post was last modified on 13 February 2021

RGUHS BPT 3rd Year Last 10 Years 2011-2021 Previous Question Papers|| Rajiv Gandhi University of Health Sciences


Roll No.

Total No. of Questions : 09

Total No. of Pages : 03

--- Content provided by​ FirstRanker.com ---

B.Arch.(2012 & Onwards) (Sem.-6)

ESTIMATING, COSTING & SPECIFICATIONS – I

Subject Code : BACH-606

Time: 3 Hrs.

M.Code : 72292

--- Content provided by‍ FirstRanker.com ---

Max. Marks : 60

INSTRUCTIONS TO CANDIDATES :

  1. Attempt total FIVE questions with minimum TWO questions from EACH UNIT and COMPULSORY question no. 1.
  2. Assume the missing data if any and mention that along with answer.
  1. a) What are the different types of Estimate? (2)

    --- Content provided by​ FirstRanker.com ---

    b) What do you mean by detailed specification? (2)
    c) What are the units of measurement for paint work? (2)
    d) What do you mean by standard PWD specification? (2)
    e) What are the units of measurement food work? (2)

UNIT-I

--- Content provided by‌ FirstRanker.com ---

  1. Define Estimate. Discuss, in detail, the various methods of approximate estimation as required for a particular type of building. Discuss the merits and demerits of each method of estimation. (12.5)
  2. Calculate the material requirement i.e. No. of Cement Bags, Sand, Bricks, and Coarse Aggregate for the following items :
    1. Cement concrete in 1:3:6 for R.C.C. work excluding reinforcement for total 100 cubic meter quantity. (6)
    2. 230 mm thick first class brick masonry works for the superstructure of 125 cum quantity in cement mortar 1:6. (6.5)
  3. “To finalise the rate of an item, the analysis of rates is must.” Justify the statement in context of cost estimation of a multi storied structure with examples. (12.5)
  4. --- Content provided by​ FirstRanker.com ---

  5. Calculate the estimate of bill of quantities of the following items for a single storied structure as given plan. (Assume section by your own)
    1. Earth Work in excavation in foundation (4)
    2. Brick work in superstructure (4)
    3. Dado in kitchen and toilet (4.5)

UNIT-II

--- Content provided by⁠ FirstRanker.com ---

  1. What is the role of specification for any construction project? Explain the factors, which are kept in mind while writing specification. (12.5)
  2. What do you mean by specification? Explain the different types of specification with emphasis on accuracy in specifying the building material. (12.5)
  3. What is the general specification for firefighting system in a building? Write the detailed specification for sprinkler system in an educational building. (12.5)
  4. Write the detailed specification on the following:
    1. Damp proof course (6)
    2. Pointing work (6.5)
    3. --- Content provided by‍ FirstRanker.com ---

FirstRanker.com

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.


--- Content provided by⁠ FirstRanker.com ---


This download link is referred from the post: RGUHS BPT 3rd Year Last 10 Years 2011-2021 Previous Question Papers|| Rajiv Gandhi University of Health Sciences