FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU MCA 2020 Dec 3rd Sem 74075 Software Engineering And Project Management Question Paper

Download PTU I. K. Gujral Punjab Technical University (IKGPTU) MCA (Master of Computer Applications) 2020 December 3rd Sem 74075 Software Engineering And Project Management Previous Question Paper

This post was last modified on 14 February 2021

PTU MCA Last 10 Years 2011-2021 Previous Question Papers|| Punjab Technical University


Roll No.

Total No. of Questions : 18 Total No. of Pages : 02

MCA (2015 to 2018) (Sem.-3)

--- Content provided by‌ FirstRanker.com ---

SOFTWARE ENGINEERING & PROJECT MANAGEMENT

Subject Code : MCA-303

M.Code: 74075

Time: 3 Hrs. Max. Marks : 60

INSTRUCTIONS TO CANDIDATES :

--- Content provided by​ FirstRanker.com ---

  1. SECTIONS-A, B, C & D contains TWO questions each carrying TEN marks each and students has to attempt any ONE question from each SECTION.
  2. SECTION-E is COMPULSORY consisting of TEN questions carrying TWENTY marks in all.

SECTION-A

  1. What is software engineering? Discuss the evolution of software engineering?
  2. Discuss the importance of Software quality? How software quality can be measured?
  3. --- Content provided by‌ FirstRanker.com ---

SECTION-B

  1. Explain the following :
    1. Use of CASE Tools
    2. Change control process
  2. What is SRS? What are the characteristics of good SRS Document? Explain
  3. --- Content provided by⁠ FirstRanker.com ---

SECTION-C

  1. What are the different type of Metrics? Explain their role in software project planning?
  2. Discuss the role of Abstraction refinement and Modularity in software. Also discuss the heuristics for effective Modularity?

SECTION-D

  1. What is the use of PERT chart in project scheduling? Explain.
  2. --- Content provided by​ FirstRanker.com ---

  3. Compare and contrast the following :
    1. Verification and validation
    2. White box and black box testing

SECTION-E

  1. What are the merits and demerits of PERT Chart?
  2. --- Content provided by FirstRanker.com ---

  3. What is the need of data design?
  4. What is the role of feasibility study in software engineering?
  5. Write a note on web engineering?
  6. What is functional cohesion?
  7. What is methodology?
  8. --- Content provided by‍ FirstRanker.com ---

  9. What is the significance of spiral model?
  10. List various features of software project planning?
  11. Write any two features of object oriented design ?
  12. What are the limitations of waterfall Model?

NOTE : Disclosure of Identity by writing Mobile No. or Marking of passing request on any paper of Answer Sheet will lead to UMC against the Student.

--- Content provided by​ FirstRanker.com ---

Get most previous year question papers from FirstRanker.com



This download link is referred from the post: PTU MCA Last 10 Years 2011-2021 Previous Question Papers|| Punjab Technical University

--- Content provided by⁠ FirstRanker.com ---