Code No. 5028 / E
FACULTIES OF ARTS AND SCIENCE
--- Content provided by FirstRanker.com ---
B.A./B.Sc. I Year Examination, March / April 2015
Subject : STATISTICS (Theory)
Paper - IV
Quality Control, Reliability and Operations Research (Elective-I)
Time : 3 hours Max. Marks : 100
--- Content provided by FirstRanker.com ---
- Explain the following terms:
- Control charts for variables
- Control charts for attributes
- Explain the difference between specification limits, tolerance limits and control limits in SQC.
- Each of 10 lots of rubber belts contain 1000 rubber belts. Number of defective rubber belts in those lots are 418, 421, 326, 335, 298, 315, 292, 301, 325 and 299. Draw control chart for fraction defective and give your conclusions.
- Explain the procedure of double sampling plan. Obtain ASN and OC functions for the same.
- What is single sampling Plan? Discuss the relative merits and demerits of single and double sampling plans.
- Define Reliability. Explain the importance of hazard function in the computation of failure density.
- Define System reliability. Explain how to Compute the system reliability for K out of n system.
- Define terms i) Linear Programming problem ii) Feasible solution iii) Basic feasible solution iv) Optimum basic feasible solution
- Solve the following LPP graphically
Minimize Z= -6x1 — 4x2
Subject to 2x1 + 3x2 > 30
3x1 + 2x2 < 24
X1+x2>3--- Content provided by FirstRanker.com ---
and X1,X2>0
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
Code No. 5028 / E
2
- What are surplus and slack variables? Explain Big-M method to solve an LPP.
- Apply principle of duality to solve the LPP and also read the primal solution
Minimize Z= 12x1 + 20x2
Subject to 6x1 + 8x2 = 100
x1+ 12x2 >= 120
and X1 ,X2 >=0 - Solve the following transportation problem for optimality. Use VAM for obtaining initial basic feasible solution.
Market
Warehouse A 12
B 17
C 14 - Solve the following assignment problem using Hungarian method for optimality.
Tasks
1 5
2 6 - What is degeneracy in transportation problem? How it is resolved?
- Find the sequence that minimizes the total elapsed time in performing following six jobs on three machines in the order M1, M2, M3. Also find the idle time for these machines.
Machine M1
Machine M2
Machine M3
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
Answer any three of the following :
--- Content provided by FirstRanker.com ---
- Process control, product control
- A situation where 100% inspection is needed
- Two-phase method
- p-chart and np-chart
- Importance of SQC in industry
--- Content provided by FirstRanker.com ---
This download link is referred from the post: OU BBA Last 10 Years 2010-2020 Question Papers || Osmania University
--- Content provided by FirstRanker.com ---