FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Summer 8th Sem New 2180909 Power System Operation And Control Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 8th Sem New 2180909 Power System Operation And Control Previous Question Paper

This post was last modified on 20 February 2020

GTU BE 2019 Summer Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-VII(NEW) EXAMINATION - SUMMER 2019

--- Content provided by FirstRanker.com ---

Subject Code:2180909 Date:13/05/2019
Subject Name:Power System Operation and Control
Time:10:30 AM TO 01:00 PM Total Marks: 70

Instructions:
1. Attempt all questions.

--- Content provided by‍ FirstRanker.com ---

2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

MARKS

Q.1 (a) Define the voltage regulation 03
(b) Explain what you mean by state estimation of power system and how 04

--- Content provided by FirstRanker.com ---

does it differ from load flow solutions.
(c) Two generating units rated for 250 MW and 400 MW have governor 07
speed regulation of 6.0 and 6.4 percent, respectively, from no-load to
full-load, respectively. They are operating in parallel and share a load of
500 MW. Assuming free governor action, determine the load shared by

--- Content provided by‌ FirstRanker.com ---

each unit.

Q.2 (a) Enumerate the need for restructuring. 03
(b) Write short note on System monitoring 04
(c) Develop step by step the mathematical model for a state estimator using 07
line power flows with the help of weighted least square method as

--- Content provided by FirstRanker.com ---

suggested by Dopazo et al.
OR
(c) Describe the different types of market model 07

Q.3 (a) Define the surge impedance loading (SIL) of a transmission line. 03
(b) Find the capacity of static VAR Compensator to be installed at a bus with 04

--- Content provided by FirstRanker.com ---

+5% voltage fluctuation. The short circuit capacity is 5000 MVA.
(c) What do you mean by “Bad Data” in power system? How does it creep 07
in while obtaining a good state estimator? Explain clearly how it is taken
care of by using theory of probability
OR

--- Content provided by⁠ FirstRanker.com ---

Q.3 (a) Explain how system blackout occur. 03
(b) A 250-MW, 60-Hz-turbine generator set has a speed regulation of 5 04
percent based on its own rating. The generator frequency decreases from
60 Hz to a steady state value of 59.7Hz. Determine the increase in the
turbine power output.

--- Content provided by FirstRanker.com ---

(c) Explain factors affecting power system security. 07

Q.4 (a) What do you mean by line load ability? 03
(b) Describe the need for deregulation of various power system 04
(c) Drive the expression for steady state frequency change for single area system 07
with the following cases.

--- Content provided by‍ FirstRanker.com ---

I. Changes in load with fixed speed
2.Changes in speed with fixed demand

OR

Q.4 (a) Demonstrate why the frequency and voltage to be regulated in power 03
system?

--- Content provided by FirstRanker.com ---

(b) Discuss the importance and features of congestion management in 04
deregulated power system.
(c) Explain the following with the help of circuit diagrams. 07
1.Optimal dispatch 2 Post contingency 3 Secure dispatch 4 Secure post-
contingency

--- Content provided by‌ FirstRanker.com ---

Q.5 (a) Which method of load forecasting would you suggest for long term and 03
why?
(b) Explain various Players involved in the Indian Power sector 04
(c) Develop an expression to find the magnitude of reactive power 07
requirement for voltage control in log transmission lines.

--- Content provided by‍ FirstRanker.com ---

OR

Q.5 (a) What is meant by free governor operation? 03
(b) How is the forecaster's knowledge and intuition considered superior to 04
any load forecasting method? Should a forecaster intervene to modify a
forecast, when, why and how

--- Content provided by⁠ FirstRanker.com ---

(c) Explain with the help of block diagram automatic voltage regulator of 07
turbo generators.

FirstRanker.com


--- Content provided by​ FirstRanker.com ---


This download link is referred from the post: GTU BE 2019 Summer Question Papers || Gujarat Technological University