FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Summer 8th Sem New 2182501 Production And Operations Management Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 8th Sem New 2182501 Production And Operations Management Previous Question Paper

This post was last modified on 20 February 2020

GTU BE 2019 Summer Question Papers || Gujarat Technological University


FirstRanker.com
Subject Code:2182501 Date:15/05/2019
Subject Name:Production and Operations Management

--- Content provided by⁠ FirstRanker.com ---

Time:10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. Make suitable assumptions wherever necessary.
  3. Figures to the right indicate full marks.
  4. --- Content provided by⁠ FirstRanker.com ---

Q1 (a) (04)

(b) (03)

(c) (03)

Q2 (a) List various objectives of Scheduling. (04)

(b) The Clean-Car service has five cars waiting to be washed. The time required (in minutes) for washing is given below. (07)

--- Content provided by‍ FirstRanker.com ---

Car 1 2 3 4 5
Wash 5 7 10 8 3

In what order should the cars be processed to minimize average flow time?

(c) Discuss the process of vendor rating. (07)

OR

(c) Discuss scheduling approach for various types of manufacturing processes. (07)

Q3 (a) List various objectives of Process Planning. (03)

--- Content provided by​ FirstRanker.com ---

(b) What are the major cost factors considered in process selection? How is breakeven analysis used for process selection? (04)

(c) List some of the operations and functions in a company that are dependent on a forecast for product demand. (07)

OR

(c) What is the difference between quantitative forecast methods and qualitative forecast methods? (07)

Q3 (a) The Good and Rich Candy Company makes a variety of candies in three factories worldwide. Its line of chocolate candies exhibits a highly seasonal demand pattern, with peaks during the winter months (for the holiday season and Valentine’s Day) and valleys during the summer months (when chocolate tends to melt and customers are watching their weight). Given the following costs and quarterly sales forecasts, determine whether (a) level production, or (b) chase demand would more economically meet the demand for chocolate candies: (04)

--- Content provided by​ FirstRanker.com ---

Quarter Spring Summer Fall Winter
Sales Forecast 80000 50000 120000 150000

Beginning workforce = 100 workers

Production per employee = 1000 pounds per quarter

Regular production cost per pound = Rs.2.00

Inventory carrying cost = Rs. 0.50 per pound per quarter

Firing cost = Rs. 500 per worker

--- Content provided by‍ FirstRanker.com ---

Hiring cost = Rs. 100 per worker

(b) Identify several industries that have highly variable demand patterns. Explore how they adjust capacity. (04)

(c) Describe the output of aggregate planning. (07)

Q4 (a) MSYV Fashion, a shoe manufacturing company is trying to determine how best to produce its new line of shoes for expanded feet. Demand for its w-i-d-e products is uncertain. Given the alternative processes and costs below, determine at what level of demand you would choose each process. (07)

Process A B C
Fixed Cost Rs. 20,000/- Rs. 10,000/- Rs. 0/-
Variable Cost Rs. 5/- Rs. 10/- Rs. 20/-

(b) Best Vision is revamping its assembly lines to improve efficiency. As shown below, there are 10 steps to assembling a television set. (10)

--- Content provided by​ FirstRanker.com ---

a. If Best needs to produce 120 televisions in a 40-hour work week, how should the line be balanced? Given that one worker is assigned to each workstation, how many workers are required to operate the line? What is the efficiency of the line?

b. If demand for televisions is reduced to 100 sets per 40-hour week, how many workers will be needed to man the line? Re-balance the line and re-calculate its efficiency.

Task Task Time (min) Task that must precede
A 8 -
B 4 A
C 7 A
D 3 A
E 7 B
F 11 C, E
G 2 D
H 8 G
I 5 F, H
J 7 I

Q4 (a) How do mixed-model assembly lines differ from traditional assembly lines? What additional decisions are required? (04)

OR

(a) Professional Image Briefcases is an exclusive producer of handcrafted, stylish cases. The company assembles each case with care and attention to detail. This laborious process requires the completion of the six primary work elements listed here. (10)

--- Content provided by‌ FirstRanker.com ---

Task Task Time (Mins) Task that must precede
A 30 -
B 15 A
C 10 B
D 5 -
E 10 C, D
F 10 E

a. Construct a precedence diagram for the manufacturing of briefcases.

b. Compute the flow time required for assembling one briefcase and the cycle time necessary to assemble 50 cases in a 40-hour week.

c. Balance the line and compute its efficiency.

d. How would you change the line to produce 80 cases per week?

(b) Discuss the objectives of Material Management in an organization. (04)

--- Content provided by‍ FirstRanker.com ---

Q.5 (a) Which can be measured and controlled more easily, angular or rectangular relationships? Explain. (07)

A computer software firm has experienced the following demand for its “Personal Finance” software package:

A manufacturing company has monthly demand for one of its products as follows:

Period 1 2 3 4 5 6 7 8
Demand 56 61 55 70 66 65 72 75

Develop an exponential smoothing forecast using o = 0.40 and an adjusted exponential smoothing forecast using o = 0.40 and 3 = 0.20. Compare the accuracy of the two forecasts using MAD.

Q.5 (a) How does the term Straightness apply to a cylinder? What problems arise in measuring straightness as it is defined? (07)

--- Content provided by FirstRanker.com ---

(b) Discuss the advantages and disadvantages of using part time workers, subcontracting work, and building up inventory as strategies for meeting demand. (07)