FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2018 Winter 6th Sem New 2161709 Programmable Logic Controller Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 6th Sem New 2161709 Programmable Logic Controller Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER-VI (NEW) EXAMINATION - WINTER 2018

--- Content provided by⁠ FirstRanker.com ---

Subject Code:2161709 Date:30/11/2018

Subject Name:Programmable Logic Controller

Time: 02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by‌ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.
Q.1 (a) List the benefits offer by PLC. Explain at least four in brief. 03
(b) Why programming tools are essential part with PLC operation? How it differ from Personal Computer as programming tool? Explain it technically. 04
(c) List the input field and output field device and draw its equivalent ladder Symbols. 07
Q2 (a) Explain differences between fixed I/O’s and modular I/O’s. 03
(b) What is the advantages offer by HMI? Explain it in details 04
(c) Develop Ladder logic diagram for each of the following Boolean expressions using AND, OR, and NOT gates:
(a) Y= ABC+D
(b) Y=A+B+CD

--- Content provided by‍ FirstRanker.com ---

(c) Y=(A+B)(C+D)
07
OR
(a) Draw and describe Input Image Table and Output Image table. 07
Q3 (a) How will High Speed Counter module works? Describe with Suitable Application 03
(b) Describe with neat sketch and operation with PLC
(1) Proximity Sensor (2) Magnetic Reed Relay:
04
(c) Prepare Ladder Logic Diagram (LLD) for following process control.
Fill tank (T) fully by opening inlet solenoid valve SV-1. When it full, open outlet valve SV-2 for 5 sec. Either open SV-1 for 10 sec or till the tank is full which will occur first than open SV2 again. Repeat it continuously.
07
OR
(a) Why Latch and Unlatch Instruction required in PLC Programming? How it is close to retentive timer operation. 03
(b) Draw and describe ON Timer delay instruction with suitable example 04
(c) Prepare LLD to count how many persons attend reception in dining hall? Use counter at entry as well as at exit. 07
Q4 (a) Explain for ADD, SUB, MUL and DIV instruction. 03
(b) Draw and design LLD to generate wave from with 40% duty cycle at digital output terminal when toggle switch is ON. Take output frequency generated by assigning TIMER as 5 sec On time and 3 sec OFF timer 04
(c) Prepare LLD to Turn-On Lamp-1 for 5 sec, Lamp-2 for 10 sec, Lamp-3 for 15 sec and Lamp-4 for 20 sec sequentially ( At a time only one lamp will be ON). Repeat it continuously. 07
OR
(a) Why tuning is required in PID Module? Describe PID module along with technical reason. 03
(b) Justify the need of Interrupt in PLC operation. Describe following instruction
1 ENI 2. RETI
3. DTCH 4. CLR EVNT
04
(c) Develop LLD an alarm annunciator system. Switch OFF the lamp when 120 sec passed without any acknowledgement. 07
Q5 (a) How will you implements communication network for PLC? Explain with industrial communication. 03
(b) Draw and illustrate twin axis Robot with PLC sequencer control 04
(c) Prepare LLD for following Level Control System.

--- Content provided by⁠ FirstRanker.com ---

Be sure motor star when Low Level switch is OFF(Open) and Overhead tank High switch is Open ( OFF).
07
OR
(a) Enlist data handling Function. Describe for data move and rotate instructions. 03
(b) Describe with ladder diagram,
Structured Text
Function block diagram
Instruction list
sequential function chart type PLC Languages
04
(c) Prepare LLD for Batch process control

--- Content provided by‌ FirstRanker.com ---

1. Open SV-1 to fill fluid in the tank till level switch will be ON. Otherwise OFF.
2.Be sure once level achieved, SV-2 will open,
3. Motor will be started, Wait till temperature achieved.
4. Stop motor. OFF SV-2
5. ON SV-3 for 10 sec

--- Content provided by‍ FirstRanker.com ---

5. Repeat from step 1 .
Be sure once SV-2
07

FirstRanker.com



--- Content provided by‍ FirstRanker.com ---

This download link is referred from the post: GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University