FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU B.Tech 2020 March Civil 6th Sem BTCE 606 Environmental Engineering Ii Question Paper

Download PTU (I.K. Gujral Punjab Technical University Jalandhar (IKGPTU) ) BE/BTech Civil Engineering (CE) 2020 March 6th Sem BTCE 606 Environmental Engineering Ii Previous Question Paper

This post was last modified on 21 March 2020

PTU B.Tech Question Papers 2020 March (All Branches)


FirstRanker.com

Roll No. Total No. of Pages : 02

Total No. of Questions : 09

--- Content provided by‍ FirstRanker.com ---

B.Tech.(CE) (2012 to 2017) (Sem.-6)

ENVIRONMENTAL ENGINEERING-II

Subject Code : BTCE-606

M.Code : 71087

Time : 3 Hrs. Max. Marks : 60

--- Content provided by FirstRanker.com ---

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.

SECTION-A

--- Content provided by FirstRanker.com ---

  1. Answer briefly :
    1. What is combined system?
    2. Define Time of concentration.
    3. What is anaerobic decomposition?
    4. Mention two difference between domestic sewage and industrial sewage composition.
    5. What is BOD kinetics?
    6. --- Content provided by​ FirstRanker.com ---

    7. What is sludge stabilization?
    8. Define Total Organic Carbon.
    9. What are the various systems of plumbing in a building?
    10. Mentions the locations where you need to provide inspection chamber.
    11. What is macrophyte pond?
    12. --- Content provided by​ FirstRanker.com ---

SECTION-B

  1. What are the requirements of sewage pumping stations?
  2. A town having population of 40,000 disposes sewage by land treatment. It gets a per capita assured water supply @ 130 litres/day. Assuming that the land used for sewage disposal can absorb 80m³ of sewage per hectare per day, determine the land area required.
  3. Discuss the trickling filter unit details and how does it work.
  4. --- Content provided by‌ FirstRanker.com ---

  5. Discuss nutrient removal and polishing of waste water.
  6. Draw a treatment plant for a municipal waste water discharging to a river. Discuss the importance of each unit.

SECTION-C

  1. Write short notes on :
    1. Drop manhole;
    2. Street inlets
    3. --- Content provided by FirstRanker.com ---

  2. A city discharges 125 m³/sec of sewage into a perennial river which is fully saturated with oxygen and flows at a minimum rate of 1600 m³/sec with a minimum velocity of 0.12 m/sec. If 5-day BOD5 of the sewage is 300mg/l, find out where the critical DO will occur in the river. Assume; the coefficient for purification of river is 4.0, the coefficient of DO is 0.11, and the ultimate BOD is 125% of the 5-day BOD of the mixture of sewage and river water.
  3. Design a septic tank for a small colony of 150 persons provided with an assured water supply from the municipal authority @ 120 litres/person/day. Assume any suitable data if required.

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.

FirstRanker.com

--- Content provided by FirstRanker.com ---



This download link is referred from the post: PTU B.Tech Question Papers 2020 March (All Branches)

--- Content provided by​ FirstRanker.com ---