FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTU-Hyderabad MBA 1st Sem R17 2018 Jan 741AG Project Management Question Paper

Download JNTUH (Jawaharlal Nehru Technological University Hyderabad) MBA (Master of Business Administration) 1st Semester (First Semester) R17 2018 Jan 741AG Project Management Previous Question Paper

This post was last modified on 23 October 2020

This download link is referred from the post: JNTUH MBA 1st Sem Last 10 Year Question Papers (2010-2020) All Regulation-First Semester (JNTU Hyderabad)


Firstranker's choice

FirstRanker.com

R17

--- Content provided by FirstRanker.com ---

Code No: 741AG

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

MBA I Semester Examinations, January-2018

PROJECT MANAGEMENT

Time: 3hours

--- Content provided by FirstRanker.com ---

Max.Marks:75

Note: This question paper contains two parts A and B.

Part A is compulsory which carries 25 marks. Answer all questions in Part A.

Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

PART - A 5 × 5 Marks = 25

--- Content provided by FirstRanker.com ---

  1. a) What are the characteristics of a ‘Project'? What are the unique characteristics of project management? [5]
  2. b) Explain the concept of Social Cost Benefit Analysis? [5]
  3. c) What are the advantages and limitations of Payback period method? [5]
  4. d) What are the essential features of quality assurance system? [5]
  5. e) What type of organization structure is best suited for project management? Why? [5]
  6. --- Content provided by FirstRanker.com ---

PART - B 5×10 Marks = 50

  1. a) What suggestions would you offer to persons scouting for new project ideas? b) What is the importance of screening of project ideas? What are ‘Drop errors' and 'Go errors' in this context? [5+5]

    OR

  2. a) What are the special characteristics of ‘public sector' projects? b) What are the different stages of project life cycle? [5+5]
  3. a) What are the steps to be followed in undertaking a ‘sample survey'? b) What are the aspects to be considered while performing ‘technical analysis'? [5+5]
  4. --- Content provided by FirstRanker.com ---

  5. An all equity firm is evaluating the following projects:
    Project Beta Expected return
    A 0.5 15
    B 0.8 16
    C 1.2 21
    D 1.6 22
    E 1.7 23

    The risk free rate is 11 percent and the expected market risk premium is 6 percent. The firm's cost of capital is 16 percent.

    a) Which project should be accepted?

    b) If the firm's cost of capital is as a hurdle rate, which projects will be accepted or rejected incorrectly? [10]

  6. a) What are the advantages and limitations equity capital financing of the project? b) What is venture capital? [6+4]

    OR

    --- Content provided by FirstRanker.com ---

  7. a) The following table presents the possible cash flows for projects A and B, and their associate probabilities. You are required to calculate the expected monetary value of each project and state which project is to be considered.
    possibilities Project A Project B
    Cash flow Rs. Probability Cash flow Rs. probability
    1 7,00,000 0.10 12,00,000 0.10
    2 8,00,000 0.20 8,00,000 0.10
    3 9.00.000 0.30 6,00,000 0.10
    4 10,00.000 0.20 4,00,000 0.20
    5 11,00,000 0.20 2,00,000 0.50

    b) What do you understand by the term 'cost of capital'? How do you work out to arrive at the cost of capital?

    [6+4]
  8. a) Outline the 'lean' principles as applied to project management. b) What are the major elements of quality cost? [5+5]

    OR

  9. --- Content provided by FirstRanker.com ---

  10. A project consisting of eight activities has the following characteristics.
    Activity Preceding activity Time estimates in weeks
    Optimistic Most likely pessimistic
    A - 2 4 12
    B - 10 12 26
    C A 8 9 10
    D A 10 15 20
    E A 7.5 9 11
    F B,C 3 3.5 7
    G D 5 5 5
    H E,F,G 5 5 5

    a) Draw the PERT network for the project.

    b) Determine the critical path. [10]

  11. What are the tasks and distinguishing features of a project leader? How does it differ from project management? [10]

    OR

  12. --- Content provided by FirstRanker.com ---

  13. What is a team? What are the challenges of building a well-knit multidisciplinary project team? [10]

--00000--

FirstRanker.com


--- Content provided by FirstRanker.com ---


This download link is referred from the post: JNTUH MBA 1st Sem Last 10 Year Question Papers (2010-2020) All Regulation-First Semester (JNTU Hyderabad)