FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTU-Hyderabad MBA 1st Sem R17 2018 Dec 741AG Project Management Question Paper

Download JNTUH (Jawaharlal Nehru Technological University Hyderabad) MBA (Master of Business Administration) 1st Semester (First Semester) R17 2018 Dec 741AG Project Management Previous Question Paper

This post was last modified on 23 October 2020

This download link is referred from the post: JNTUH MBA 1st Sem Last 10 Year Question Papers (2010-2020) All Regulation-First Semester (JNTU Hyderabad)


Firstranker's choice

FirstRanker.com

R17 Code No: 741AG

--- Content provided by FirstRanker.com ---

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

MBA I Semester Examinations, December - 2018

PROJECT MANAGEMENT

Time: 3hours Max.Marks:75

Note: This question paper contains two parts A and B.

--- Content provided by FirstRanker.com ---

Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

PART - A 5×5 Marks = 25

  1. a) What is project schedule. [5]
  2. b) What is the importance of social cost benefit analysis for project appraisal? [5]
  3. c) Explain with help of suitable example the payback period approach for project evaluation. [5]
  4. --- Content provided by FirstRanker.com ---

  5. d) What is cost breakdown structure? [5]
  6. e) What are the different roles of a project manager? [5]

PART - B 5 × 10 Marks = 50

  1. a) Discuss the phases of project life cycle. Explain with help of suitable example. [10]
    b) What are the hurdles in Govt. projects for quick completion? [10]

    --- Content provided by FirstRanker.com ---

    OR
  2. a) What is project management? Explain the basic characteristics of a project? [5+5]
    b) How can systems approach be adopted to Project Management? [5+5]
  1. What do you understand by project risk analysis? How can it be beneficial for project
    OR
  2. --- Content provided by FirstRanker.com ---

  3. Before commencement of any project a Feasibility Report is prerequisite. Elaborate the process in detail. [10]
  1. Write short note on
    a) NPV
    b) IRR [5+5]
    OR
  2. --- Content provided by FirstRanker.com ---

  3. Explain how and why financial projection is needed for various projects. [10]
  1. Draw the network diagram and determine the critical path for the following project:
    Activity Time estimate (Weeks)
    1-2 5
    1-3 6
    1-4 3
    2-5 5
    3-6 7
    3-7 10
    4-7 4
    5-8 2
    6-8 5
    7-9 6
    8-9 4
    [10]
    OR
  2. What is lean project management? What are its advantages and disadvantages? [10]
  3. --- Content provided by FirstRanker.com ---

  1. Describe in detail the importance of stress management in long duration projects. What are the different methods of reducing stress among the team members of project? [10]
    OR
  2. Describe the methods of resolving conflicts in project management. [10]