Download JNTUA MBA 2nd Sem Supple 2015 Dec 14E00205 Operations Research Question Paper

Download JNTUA (JNTU Anantapur) MBA (Master of Business Administration) 2nd Sem Supple 2015 Dec 14E00205 Operations Research Previous Question Paper


Code: 14E00205

MBA II Semester Supplementary Examinations December/January 2015/2016
OPERATIONS RESEARCH
(For students admitted in 2014 only)

Time: 3 hours Max. Marks: 60
All questions carry equal marks
*****
SECTION - A
Answer the following: (05 X 10 = 50 Marks)
1 Write a short note on cross-functional specialization requirements in operations research applications.
OR
2 A company produces two types of leather belts Type-A and Type-B. A type gives a profit of Rs.10/- per
belt and B-gives Rs.5/- per belt. The raw material supply is sufficient for making 850 belts per day.
Type-A requires a special buckle and 500 are available per day. There are 700 buckles available for
Type-B. Type A needs twice as much time as that required for Type-B and the company can produce
500 belts, if all of them were of Type-A. Formulate a LP model fro this problem and solve it graphically.

3 Find the optimum transportation plan such that the total transportation cost is lowest.
Plant
Markets
Capacity
S1 S2 S3 S4
F1 4 6 8 13 50
F2 13 11 10 8 70
F3 14 4 10 13 30
F4 9 11 13 8 50
Total 25 35 105 20

OR
4 The captain of a cricket team has to allot five middle-order batting positions to five batsmen. The
average runs scored by each batsman at these positions are as follows:
Batsmen
Batting positions
I II III IV V
P 40 40 35 25 50
Q 42 30 16 25 27
R 50 48 40 60 50
S 20 19 20 18 25
T 58 60 59 55 53
Find the assignment of batsmen to position that would give the maximum number of runs for the team.

5 A workstation has six jobs waiting to be processed. They arrived at the end of day 0 and it is now the
beginning of day I. It is now time zero. Times are expressed in terms of days.
Job
Time Since
Job Arrived
Processing
Time
Due Date
A 12 8 24
B 7 2 11
C 18 6 31
D 5 12 25
E 6 7 8
F 19 5 6
Use the information in the above table, what sequence would you use if you want to minimize the
make span of the jobs.
Contd. in page 2

Page 1 of 3
FirstRanker.com - FirstRanker's Choice

Code: 14E00205

MBA II Semester Supplementary Examinations December/January 2015/2016
OPERATIONS RESEARCH
(For students admitted in 2014 only)

Time: 3 hours Max. Marks: 60
All questions carry equal marks
*****
SECTION - A
Answer the following: (05 X 10 = 50 Marks)
1 Write a short note on cross-functional specialization requirements in operations research applications.
OR
2 A company produces two types of leather belts Type-A and Type-B. A type gives a profit of Rs.10/- per
belt and B-gives Rs.5/- per belt. The raw material supply is sufficient for making 850 belts per day.
Type-A requires a special buckle and 500 are available per day. There are 700 buckles available for
Type-B. Type A needs twice as much time as that required for Type-B and the company can produce
500 belts, if all of them were of Type-A. Formulate a LP model fro this problem and solve it graphically.

3 Find the optimum transportation plan such that the total transportation cost is lowest.
Plant
Markets
Capacity
S1 S2 S3 S4
F1 4 6 8 13 50
F2 13 11 10 8 70
F3 14 4 10 13 30
F4 9 11 13 8 50
Total 25 35 105 20

OR
4 The captain of a cricket team has to allot five middle-order batting positions to five batsmen. The
average runs scored by each batsman at these positions are as follows:
Batsmen
Batting positions
I II III IV V
P 40 40 35 25 50
Q 42 30 16 25 27
R 50 48 40 60 50
S 20 19 20 18 25
T 58 60 59 55 53
Find the assignment of batsmen to position that would give the maximum number of runs for the team.

5 A workstation has six jobs waiting to be processed. They arrived at the end of day 0 and it is now the
beginning of day I. It is now time zero. Times are expressed in terms of days.
Job
Time Since
Job Arrived
Processing
Time
Due Date
A 12 8 24
B 7 2 11
C 18 6 31
D 5 12 25
E 6 7 8
F 19 5 6
Use the information in the above table, what sequence would you use if you want to minimize the
make span of the jobs.
Contd. in page 2

Page 1 of 3

Code: 14E00205

OR
6 Solve the game graphically and find the optimum strategies for each of the player.
Player - B
Player - A
1 -3
3 5
-1 6
4 1
2 2
-5 0


7 A crew of mechanics at the department of transportation garage make minor repairs to snowplows
during the winter. The snowplows break down at an average rate of 4 vehicles per day and
breakdowns are distributed according to the Poisson distribution. The mechanic can service an
average of 7 vehicles per day with a repair time distribution that approximates a negative exponential
distribution. Assume an 8 hour day. Find out various characteristics of the queue-such as waiting time
in the queue/system, average queue length/system length and idle time for the service.
OR
8 In railway marshalling yard, goods trains arrive at the rate of 30 trains per day. Assuming that inter-
arrival time and service time distribution follows an exponential distribution with an average of
30 minutes, calculate the following:
(a) The mean queue size.
(b) The probability that queue size exceeds10.
(c) If the input of train increases to an average of 33 per day, what will be the changes in (a) and (b)?

9 New age power solutions limited provides electrical generator services [of 5 KVA, 10 KVA, 25 KVA
capacities] on lease basis or daily rentals to apartments, industrial activities, public meetings, marriage
halls etc. As the maintenance cost increases rapidly the company replaces generators periodically.
The purchase price of a 5 KVA generator is INR 2,50,000. Annual maintenance and repairs cost and
resale value are detailed in the following table.
Year 1 2 3 4 5 6 7 8
Resale value (INR 150000 120000 100000 75000 50000 50000 50000 25000
Maintenance & repairs
cost (INR)
20000 25000 30000 40000 50000 75000 100000 125000
Assuming that there is no time value for money, determine the optimal replacement policy.
OR
10 In a youth hostel there are 100 rooms, each room is fitted with a tube light. The bulbs are replaced
when they fail individually and group replacement is also done at regular intervals. The probability of
failure of tube lights for the four quarters is given below:
Q
1
Q
2
Q
3
Q
4

0.15 0.20 0.50 0.15
Cost of individual replacement is INR 125/- , whereas for group replacement, the cost is INR 30/-
suggest a suitable replacement policy.

Contd. in page 3



Page 2 of 3
FirstRanker.com - FirstRanker's Choice

Code: 14E00205

MBA II Semester Supplementary Examinations December/January 2015/2016
OPERATIONS RESEARCH
(For students admitted in 2014 only)

Time: 3 hours Max. Marks: 60
All questions carry equal marks
*****
SECTION - A
Answer the following: (05 X 10 = 50 Marks)
1 Write a short note on cross-functional specialization requirements in operations research applications.
OR
2 A company produces two types of leather belts Type-A and Type-B. A type gives a profit of Rs.10/- per
belt and B-gives Rs.5/- per belt. The raw material supply is sufficient for making 850 belts per day.
Type-A requires a special buckle and 500 are available per day. There are 700 buckles available for
Type-B. Type A needs twice as much time as that required for Type-B and the company can produce
500 belts, if all of them were of Type-A. Formulate a LP model fro this problem and solve it graphically.

3 Find the optimum transportation plan such that the total transportation cost is lowest.
Plant
Markets
Capacity
S1 S2 S3 S4
F1 4 6 8 13 50
F2 13 11 10 8 70
F3 14 4 10 13 30
F4 9 11 13 8 50
Total 25 35 105 20

OR
4 The captain of a cricket team has to allot five middle-order batting positions to five batsmen. The
average runs scored by each batsman at these positions are as follows:
Batsmen
Batting positions
I II III IV V
P 40 40 35 25 50
Q 42 30 16 25 27
R 50 48 40 60 50
S 20 19 20 18 25
T 58 60 59 55 53
Find the assignment of batsmen to position that would give the maximum number of runs for the team.

5 A workstation has six jobs waiting to be processed. They arrived at the end of day 0 and it is now the
beginning of day I. It is now time zero. Times are expressed in terms of days.
Job
Time Since
Job Arrived
Processing
Time
Due Date
A 12 8 24
B 7 2 11
C 18 6 31
D 5 12 25
E 6 7 8
F 19 5 6
Use the information in the above table, what sequence would you use if you want to minimize the
make span of the jobs.
Contd. in page 2

Page 1 of 3

Code: 14E00205

OR
6 Solve the game graphically and find the optimum strategies for each of the player.
Player - B
Player - A
1 -3
3 5
-1 6
4 1
2 2
-5 0


7 A crew of mechanics at the department of transportation garage make minor repairs to snowplows
during the winter. The snowplows break down at an average rate of 4 vehicles per day and
breakdowns are distributed according to the Poisson distribution. The mechanic can service an
average of 7 vehicles per day with a repair time distribution that approximates a negative exponential
distribution. Assume an 8 hour day. Find out various characteristics of the queue-such as waiting time
in the queue/system, average queue length/system length and idle time for the service.
OR
8 In railway marshalling yard, goods trains arrive at the rate of 30 trains per day. Assuming that inter-
arrival time and service time distribution follows an exponential distribution with an average of
30 minutes, calculate the following:
(a) The mean queue size.
(b) The probability that queue size exceeds10.
(c) If the input of train increases to an average of 33 per day, what will be the changes in (a) and (b)?

9 New age power solutions limited provides electrical generator services [of 5 KVA, 10 KVA, 25 KVA
capacities] on lease basis or daily rentals to apartments, industrial activities, public meetings, marriage
halls etc. As the maintenance cost increases rapidly the company replaces generators periodically.
The purchase price of a 5 KVA generator is INR 2,50,000. Annual maintenance and repairs cost and
resale value are detailed in the following table.
Year 1 2 3 4 5 6 7 8
Resale value (INR 150000 120000 100000 75000 50000 50000 50000 25000
Maintenance & repairs
cost (INR)
20000 25000 30000 40000 50000 75000 100000 125000
Assuming that there is no time value for money, determine the optimal replacement policy.
OR
10 In a youth hostel there are 100 rooms, each room is fitted with a tube light. The bulbs are replaced
when they fail individually and group replacement is also done at regular intervals. The probability of
failure of tube lights for the four quarters is given below:
Q
1
Q
2
Q
3
Q
4

0.15 0.20 0.50 0.15
Cost of individual replacement is INR 125/- , whereas for group replacement, the cost is INR 30/-
suggest a suitable replacement policy.

Contd. in page 3



Page 2 of 3

Code: 14E00205

SECTION ? B
(Compulsory Question) 01 X 10 = 10 Marks
11 Case study:
Find out the critical path for the project, whose activities, precedence relation and durations are given
below. Find out mean project completion time and estimated standard deviation in completing the
project.
(a) Find out the probability of the project takes more than 30 weeks to complete.
(b) Find out the probability of the project gets completed fewer than 21 weeks.

S.No Activity
Precedence
relationship
Duration ? [in weeks]
Optimistic Normal Pessimistic
1 A - 1 3 5
2 B A 1 2 3
3 C A 2 5 8
4 D A, B 1 4 7
5 E C 2 2 2
6 F D, E 1 5 9
7 G B 2 6 10
8 H D 3 6 15
9 I G, H 1 2 3
10 J F, H 2 5 8
11 K G 4 9 14
12 L K 1 2 3
13 M L 13 2 3
14 N I,J 4 5 6


*****













Page 3 of 3