Download AKTU B-Tech 8th Sem 2015-16 ECS 082 Software Project Management Question Paper

Download AKTU (Dr. A.P.J. Abdul Kalam Technical University (AKTU), formerly Uttar Pradesh Technical University (UPTU) B-Tech 8th Semester (Eight Semester) 2015-16 ECS 082 Software Project Management Question Paper

Printed Pages: 4 ECS-082
(Following Paper ID and Roll No. to be ?lled in your
Answer Books)
RollNofl llllll
B.TECH.
Theory Examination (Semester-Vlll) 2015-16
SOFTWARE PROJECT MANAGEMENT
Time : 3 Hours Max. Marks : 100
Section-A
l. Attempt all parts. All parts carry equal marks. Write
answ er of each part in short. (2XIO=20)
(a)
(b)
(C)
(d)
(e)
? What is project management? Explain the deed for
software project management.
Differentiate between veri?cation and validation.
What are the different project organization types?
What are the driving factors for achieving software
quality?
Write about results of major milestones in a modern
process.
(1) P.T.O.
24053612596450

(t) Explain with example software project control panel.
(g) Explain the steps for so?ware estimation using Func-
tion Point Analysis (FPA).
(h) What is a test plan? List the contents of a test plan.
(i) What are the activities under software con?guration
management (SCM)?
0) Give an overview of the artifact sets that make the
development of a complete software system?man-
ageable.
Section-B
2. Attempt any ?ve questions from this section.
(lOXS=-50)
(a) Consider a program with an initial of 10 failure/cpu and 100
total faitures. Calculate the failure experienced after 10 and
100 cpu hour of execution.
(b) Differentiate the purpose of using network diagrams, Gantt
clnrt and tracking Gantt chart?
(c) Draw a schematic diagram of the architecture of the CASE
environment and explain how the different tools are inte-
grated.
(2)
2405/96/258/6450
(d)
(e)
(f)
(*0
Explain with diagramImtic illustration the project nmagement
life cycle?
What do you mean by a project ?ow diagram? How does it
help in project planning?
Is it practical to specify maintainability in SRS? How would
you specify it? Would it be a testable requirement?
What are the bene?ts of using work breakdown structure
(WBS)? What is a critical path? Why is it important to
identify the critical path?
What are the di?'erent techniques for project monitoring and
control?
Sec?on-C
Note: Attempt any two questions from this section.
(15x2=30)
What isproject schedllling?Listanddiscu$thevariousproject
scheduling activities. What are the bene?ts of agile project
Immgement?
What are the software development modes in COCOMO?
Give formula for e??ort / schedule estimation in basic
COCOMO.
(3) P.T.O.
2405/96/258/6450

5. Write Short Note on
(a) EVA. SPI. CPI.
(b) Cyclomatic cqmplexity.
(c) Functional and Structural testing.
(4)
2405/?5/258/6450