Download AKTU B-Tech 8th Sem 2016-17 ECS082 Software Project Management Question Paper

Download AKTU (Dr. A.P.J. Abdul Kalam Technical University (AKTU), formerly Uttar Pradesh Technical University (UPTU) B-Tech 8th Semester (Eight Semester) 2016-17 ECS082 Software Project Management Question Paper

This post was last modified on 30 January 2020

AKTU B-Tech Last 10 Years 2010-2020 Previous Question Papers || Dr. A.P.J. Abdul Kalam Technical University


Roll FirstRanker.com

B.TECH.

FirstRanker.com

--- Content provided by FirstRanker.com ---

THEORY EXAMINATION (SEM–VIII) 2016-17

SOFTWARE PROJECT MANAGEMENT

Time: 3 Hours

Max. Marks : 100

Note: Be precise in your answer. In case of numerical problem assume data wherever not provided.

--- Content provided by FirstRanker.com ---

SECTION – A

  1. Attempt the following: 10 x 2 = 20
    1. Explain SPM Framework.
    2. Explain the term Project Scope with example.
    3. Enumerate the authorities of a Project Manager.
    4. Compare PERT and CPM.
    5. --- Content provided by​ FirstRanker.com ---

    6. Write the steps of software development.
    7. Explain cost benefit Analysis.
    8. What is meant by Software configuration management?
    9. Explain unit testing and system testing.
    10. What do you mean by Code Inspection?
    11. --- Content provided by‌ FirstRanker.com ---

    12. What is the difference between change control and version control?

SECTION – B

  1. Attempt any five of the following questions: 5 x 10 = 50
    1. Give the Overview of the stepwise planning of the software project Development.
    2. What do you mean by Work Break down Structure in context to software project and product? Discuss with example.
    3. --- Content provided by​ FirstRanker.com ---

    4. Explain all types of Risks which occur during software development.
    5. Define various type of testing strategies with example
    6. What do you understand by Verification and validation? Explain their difference with example.
    7. Write COCOMO model in detail.
    8. Explain project monitoring and controlling process. Explain different dimensions of project monitoring and control.
    9. --- Content provided by‍ FirstRanker.com ---

    10. Discuss the different steps of preparing the schedule. What are the Inputs and outputs required by Schedule?

SECTION - C

  1. Attempt any two of the following questions: 2 x 15 = 30
    1. What do you understand by “Earned Value Analysis”? Discuss the following Progress indicators:
      1. Cost Variance
      2. Schedule performance Index(SPI)
      3. --- Content provided by‌ FirstRanker.com ---

      4. Cost Performance Index (CPI)
    2. Explain the following:
      1. Software Quality Attributes
      2. SEI-CMM
    3. --- Content provided by‍ FirstRanker.com ---

    4. Explain various types of software project management Tools.