Download PTU B.Arch 2020 March 6th Sem 72292 Estimating, Costing And Specifications I Question Paper

Download PTU (I.K. Gujral Punjab Technical University Jalandhar (IKGPTU) B.Arch 2020 March (Bachelor of Architecture) 6th Sem 72292 Estimating, Costing And Specifications I Previous Question Paper

1 | M-72292 (S17)-1778

Roll No. Total No. of Pages : 03
Total No. of Questions : 09
B.Arch.(2012 & Onwards) (Sem.?6)
ESTIMATING, COSTING & SPECIFICATIONS ? I
Subject Code : BACH-606
M.Code : 72292
Time : 3 Hrs. Max. Marks : 60
INSTRUCTIONS TO CANDIDATES :
1. Attempt total FIVE questions with minimum TWO questions from EACH UNIT
and COMPULSORY question no. 1.
2. Assume the missing data if any and mention that along with answer.

Q1. a) What do you mean by Estimate? (2)
b) Enlist the different types of specification? (2)
c) What are the units of measurement for plaster work in cement mortar? (2)
d) What do you mean by standard PWD specification? (2)
e) What are the units of measurement for earth work in excavation? (2)

UNIT-I
Q2. Enlist the different types of Estimate. Discuss the need and importance of estimate at
various stages of project. Explain the most accurate method of estimation, in detail. (12.5)
Q3. Calculate the material requirement i.e. No. of Cement Bags, Sand, Bricks, and Coarse
Aggregate for the following items :
a) Cement concrete in 1:2:4 for R.C.C. work excluding reinforcement for total 200 cubic
meter quantity. (6)
b) 230 mm thick first class brick masonry works for the superstructure of 130 cum
quantity in cement mortar 1:6. (6.5)
FirstRanker.com - FirstRanker's Choice
1 | M-72292 (S17)-1778

Roll No. Total No. of Pages : 03
Total No. of Questions : 09
B.Arch.(2012 & Onwards) (Sem.?6)
ESTIMATING, COSTING & SPECIFICATIONS ? I
Subject Code : BACH-606
M.Code : 72292
Time : 3 Hrs. Max. Marks : 60
INSTRUCTIONS TO CANDIDATES :
1. Attempt total FIVE questions with minimum TWO questions from EACH UNIT
and COMPULSORY question no. 1.
2. Assume the missing data if any and mention that along with answer.

Q1. a) What do you mean by Estimate? (2)
b) Enlist the different types of specification? (2)
c) What are the units of measurement for plaster work in cement mortar? (2)
d) What do you mean by standard PWD specification? (2)
e) What are the units of measurement for earth work in excavation? (2)

UNIT-I
Q2. Enlist the different types of Estimate. Discuss the need and importance of estimate at
various stages of project. Explain the most accurate method of estimation, in detail. (12.5)
Q3. Calculate the material requirement i.e. No. of Cement Bags, Sand, Bricks, and Coarse
Aggregate for the following items :
a) Cement concrete in 1:2:4 for R.C.C. work excluding reinforcement for total 200 cubic
meter quantity. (6)
b) 230 mm thick first class brick masonry works for the superstructure of 130 cum
quantity in cement mortar 1:6. (6.5)
2 | M-72292 (S17)-1778

Q4. ?To finalise the rate of an item, the analysis of rates is must.? Justify the statement in
context of cost estimation of a multi storied structure with examples. (12.5)
Q5. Calculate the estimate of bill of quantities of the following items for a single storied
structure as given plan. (Assume section by your own)
a) Earth Work in excavation in foundation (4)
b) Brick work in superstructure (4)
c) Cement Plaster inside the building (4.5)

FirstRanker.com - FirstRanker's Choice
1 | M-72292 (S17)-1778

Roll No. Total No. of Pages : 03
Total No. of Questions : 09
B.Arch.(2012 & Onwards) (Sem.?6)
ESTIMATING, COSTING & SPECIFICATIONS ? I
Subject Code : BACH-606
M.Code : 72292
Time : 3 Hrs. Max. Marks : 60
INSTRUCTIONS TO CANDIDATES :
1. Attempt total FIVE questions with minimum TWO questions from EACH UNIT
and COMPULSORY question no. 1.
2. Assume the missing data if any and mention that along with answer.

Q1. a) What do you mean by Estimate? (2)
b) Enlist the different types of specification? (2)
c) What are the units of measurement for plaster work in cement mortar? (2)
d) What do you mean by standard PWD specification? (2)
e) What are the units of measurement for earth work in excavation? (2)

UNIT-I
Q2. Enlist the different types of Estimate. Discuss the need and importance of estimate at
various stages of project. Explain the most accurate method of estimation, in detail. (12.5)
Q3. Calculate the material requirement i.e. No. of Cement Bags, Sand, Bricks, and Coarse
Aggregate for the following items :
a) Cement concrete in 1:2:4 for R.C.C. work excluding reinforcement for total 200 cubic
meter quantity. (6)
b) 230 mm thick first class brick masonry works for the superstructure of 130 cum
quantity in cement mortar 1:6. (6.5)
2 | M-72292 (S17)-1778

Q4. ?To finalise the rate of an item, the analysis of rates is must.? Justify the statement in
context of cost estimation of a multi storied structure with examples. (12.5)
Q5. Calculate the estimate of bill of quantities of the following items for a single storied
structure as given plan. (Assume section by your own)
a) Earth Work in excavation in foundation (4)
b) Brick work in superstructure (4)
c) Cement Plaster inside the building (4.5)

3 | M-72292 (S17)-1778

UNIT- II
Q6. What is the need of specification? Explain the factors, which are kept in mind while
writing specification. (12.5)
Q7. Write in detail the importance of specification writing for architects. Explain the various
steps involved in specification writing. (12.5)
Q8. What is the general specification for water supply system in a residential building? Write
the detailed specification for European water closet and wash basin. (12.5)
Q9 Write the detailed specification on the following :-
a) Damp proof course (6)
b) Kota stone flooring (6.5)











NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any
page of Answer Sheet will lead to UMC against the Student.
FirstRanker.com - FirstRanker's Choice

This post was last modified on 31 March 2020