Roll No. Total No. of Pages : 02
Total No. of Questions : 05
--- Content provided by FirstRanker.com ---
B.Arch. (Sem.-8)
BUILDING CONSTRUCTION-VII
Subject Code : AR-424
M.Code : 45054
Time : 4 Hrs. Max. Marks: 100
--- Content provided by FirstRanker.com ---
INSTRUCTION TO CANDIDATES :
- QUESTION No. 1 is COMPULSORY and carries 40 Marks.
- Attempt any TWO more questions from the REST which have equal weightage.
Q1. Draw the working details of the following :
- Expansion joint detail between RCC slabs on Roof top.
- Typical detail for Showcase window of Books Shop.
- Water proofing treatment for a building having plinth 1.5 meters above ground level
- Thermal insulation for RCC roof
--- Content provided by FirstRanker.com ---
Q2. Draw the complete interior layout for a Hotel reception lobby. Also draw the construction details of Reception counters. (Plan enclosed)
Q3. What do you understand by Water Proofing? Draw the typical construction details of Water proofing of a basement retaining wall.
--- Content provided by FirstRanker.com ---
Q4. Draw the construction details for shop front of an Antiques sale shop having a width of 4.5 meters.
Q5. Draw the typical false ceiling construction details for a Medicine shop including lighting along with display counters.
1|M-45054 (S17)-2849
WAITING/ RECEPTION HALL
--- Content provided by FirstRanker.com ---
12.0x12.0mHOTEL WAITING/ RECEPTION
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.
2|M-45054 (S17)-2849
--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU B-Arch 2019 May Previous Question Papers
--- Content provided by FirstRanker.com ---